Rochester, MN
Rochester, MN
415 SW 2 AVE, Rochester
Electrical work associated with controls for CRC system on first floor Mayo: Nucleus RadoPharma lab tenant Improvement Harris Job # BL
415 SW 2 AVE, Rochester
Two Discovery Square 1st Floor Core & Shell Modifications.
415 SW 2 AVE, Rochester
Extend supply and return duct and re-balance to new storage room and corridor. Egan Job #515753
415 SE 3 AVE, Rochester
Replace old round meter socket to 7 terminal 3phase bypass per RPU
1415 SW 4 AVE, Rochester
Reroute gas piping to new meter location. RPH18881
415 SW 2 AVE, Rochester
Twist and fill installation
415 NE 15 AVE, Rochester
Install a new Panasonic fan for ventilation
415 NE 15 AVE, Rochester
New bath fan, in basement bath wire to code
415 SW 2 AVE, Rochester
Fire alarm system add for tenant finish Nucleus
415 SW 2 AVE, Rochester
Tenant buildout of lab space
415 SW 2 AVE, Rochester
Nucleus RadoPharma lab tenant Improvement on first floor of Two Discovery Square
415 SW 2 AVE, Rochester
Tenant Buildout on 1st Floor (Suite 160) with a new (1) DOAS unit and (1) AHU with applicable Supply/Return Duct. (1) New Lab Exhaust System with Fan & Duct including BIBO Filter. Egan Job #515461
415 SW 2 AVE, Rochester
Tenant Buildout on 1st Floor (Suite 160-Nucleus) with New waste, vent, and domestic water systems serving the lab space. New gas-fired water heater to serve fixtures with recirculating system. Egan Job #515461
415 SW 2 AVE, Rochester
Tenant Buildout on 1st floor (suite 160 - Nucleus) with new gas piping to feed (1) gas heater for HVAC, (1) domestic water heater, (1) generator. Egan Job #515461
415 SW 2 AVE, Rochester
Installing fire alarm system devices on 1st floor tenant finish
415 SW 2 AVE, Rochester
Egan Job 437067 - 2nd Floor Lab Build out - building controls
415 SW 2 AVE, STE# 2300, Rochester
Two Discovery Square - Suite 2300 - Second Level Tenant Fit-Up
415 SW 2 AVE, Rochester
Tenant buildout of lab space
415 SW 2 AVE, STE# 2300, Rochester
(1) New DOAS Air Handling Unit, (1) New Lab Exhaust System, (1) New Fan Coil Unit, New Supply and Exhaust Ductwork for New Lab Buildout on 2nd Floor. Egan Job #515049. -Daikin CAH011GDCM (1) 3600 cfm -Daikin FCHH-204A (1) 481 cfm
415 SW 2 AVE, STE# 2300, Rochester
New waste, Vent and Domestic Water Piping to support the new lab buildout on 2nd Floor. Egan Job #515049
415 SW 2 AVE, STE# 2300, Rochester
Hot & Chilled Water Piping to (1) New DOAS Air Handling Unit installed in the 2nd Floor Mechanical Room. Egan Job #515049
415 SW 2 AVE, STE# 2300, Rochester
Gas Piping to the (2) new Hot boilers installed in the new Mechanical Room on 2nd Floor. Egan Job #515049
415 SW 6 AVE, Rochester
Gas fireplace insert
415 SW 6 AVE, Rochester
Gas line for fireplace insert
2415 NW 16 AVE, Rochester
Radon Fan hook up. American Waterworks
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.