Minneapolis, MN
Minneapolis, MN
4156 21ST AVE S, Minneapolis
Remove and replace 24sq of shingles on house. Sheathing will be addressed if needed, Ventilation will be addressed if needed
415 1ST ST N, Minneapolis
convert 1st floor retail tenant space to 4 dwelling units. sck#1 certificate of occupancy required yes (for new units) const type: 1b occupancy: r2 2015 MSBC sprinklered: yes sac: _0_charges met council letter dated _5/7
415 1ST ST N, Minneapolis
FOR SUITE C/TWISTED THREAD - ROUGHIN FLOOR SINK FOR COMMERCIAL WASHING MACHINE AND ROUGHIN 3 PROCESSING SINKS.
415 1ST ST N, Minneapolis
MAIN FLOOR ADD 4 TOILETS LAVS DISHWASHER ICE MAKER 4 CLOTHES WASHERS 2 SHOWERS 2 TUB/SHOWER COMBO
415 1ST ST N, Minneapolis
Chang out 4 fan coils, installing new ductwork and new installing 4 exhaust fans per plans
4155 41ST AVE S, Minneapolis
replace gas range
415 1ST ST N, Minneapolis
Interior remodel certificate of occupancy required: no const type: occupancy: B 2015 MSBC occupant load:
415 1ST ST N, Minneapolis
revise plumbing as necessary for new sink in breakroom
3415 31ST AVE S, Minneapolis
REPLACE GAS RANGE
4157 31ST AVE S, Minneapolis
A/C - 2.5 TON, CHANGE OUT FURNACE -60,000 BTU'S
415 1ST ST N, Minneapolis
INTERIOR DEMO AND REMODEL TO MAIN LEVEL 1,678 S.F TENANT SPACE FOR TAILOR SHOP. (DMH#1) Const type: not given Occupancy: B 2015 MSBC occupant load: 15 (Archit calc.) sprinklered: YES 20% accessibility upgrades: COMPLIANT Tenant: ALL
4150 31ST AVE S, Minneapolis
Install gas fireplace. Gas by others.
4150 31ST AVE S, Minneapolis
new home furnace/ac/ new ductwork/ air to air exchanger/gas main- heating gas
4150 31ST AVE S, Minneapolis
NEW HOUSE PLUMBING
4150 31ST AVE S, Minneapolis
Construct New Single Family House with Finished Basement Floor and Detached 22'0" X 22'0" Garage. AAJ (PROJECT DOX PLANS). 2015 MNSBC/2012 IRC Energy Code: Minnesota Rules Chapter 1322 Certificate of Occupancy Required (see procedure handout attac
4150 31ST AVE S, Minneapolis
110 1ST AVE NE #F415, Minneapolis
REPLACE CONDO UNIT F415 FLOORING PERGO GOLD UNDELAYMENT STC 66 IIC 71. SOUND AND IMPACT PRODUCT ASSEMBLIES MUST BE ON SITE FOR INSPECTOR TO VERIFY MINIMUM STC 50 AND IIC 50 RATINGS ARE PRESENT WHEN NEW FLOORING IS INSTALLED.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.