Roof Top unit change
Rogers will run low voltage cabling and install 3 network switches per DOC instruction and will install oven and hood demo cords, up to 14 hardwired and 14 ethernet per location. Will also install 6 circuits to Breville display.
Kitchen Set and Range Endcap Updates - require EMS power, split quad. Drop power to Endcap. Look for existing EMS power first. If none available, install contactor to be controlled by lighting circuit. AR Expansion - Disconnect and reconnect power if needed to allow GC to expand display.
Replacing RTU's
Rogers will be disconnecting power to Microsoft tables and then reconnecting power to new tables once installed.
Rogers will disconnect and reconnect a power drop for the Nintendo display to relocate a few feet and run one data line to display.