Rochester, MN
Rochester, MN
54
7
$1,548,554
Electrical - Install new lid de-scrambler and waste water tank KEMPS
Electrical (Cooling condenser EC-5 replacement) - Erect structural steel for addition of evaporative condenser to existing refrigeration system. (Kemps Ice Cream)
Erect structural steel for addition of evaporative condenser to existing refrigeration system. (Kemps Ice Cream)
Roof top unit replacement (Kemps)
Electrical - Kemps 3DTproject KEMPS
Mechanical - HVAC system for finished product room KEMPS
Electrical - revel project KEMPS
Electrical - Reveal project HVAC KEMPS
Electrical - wiring of 2200V Ammonia compressor KEMPS ICE CREAM
Electrical - wired large homogenizer pump, oil pump & hydraulic pump KEMPS ICE CREAM
Gas Piping - gas piping for one new MUA unit KEMPS DAIRY
Electrical - install clean-in-place HVAC and exhaust fan KEMPS
Mechanical - installation of one new MUA KEMPS DAIRY
Electrical - add loaded lighting to West building, KEMPS - ROCHESTER
Replace 1,600 sq ft of section 5 with adhered TPO (Kemps)
Electrical - complete installation of new hot water pump and controls KEMPS
Electrical - install conduit from gutter in the CIP Room to the sanitizer. Install 1-20A 480V circuit and 1-15A 120V circuit.
Electrical (remodel bathroom and south lab) - Alterations to existing 2nd level bathrooms and modify vestibule and stair near entrance (Kemps - Marigold - North)
Electrical - add new 480V anel, 75KVA XFMR, 120/208 panel, upgraded electrical in south maint shop KEMPS ROCHESTER
Plumbing (replace old plumbing fixtures with updated fixtures) - Alterations to existing 2nd level bathrooms and modify vestibule and stair near entrance (Kemps - Marigold - North)
Alterations to existing 2nd level bathrooms and modify vestibule and stair near entrance (Kemps - Marigold - North)
Electrical for power for new lab CEM tester and power to overhead door (KEMPS)
Mechanical - provide exhaust and fresh air for bathrooms KEMPS
Electrical - one (1) circuit for high speed doors KEMPS
Electrical - piped and wired cord drops for three (3) conveyors and one (1) filler - airhead project KEMPS
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.