Run conduit/control wire for refrigerator control panels.
Add outlets, lighting and switches for conference room
Tear off old roof on section 3. Add 2 layers of 2.6 polyiso Rhinobond TPO system. Kemps
Add circuit for 2 new heaters in wrapper room
Add circuit for 4 air curtains in the freezer wrapper room
Add main air handler unit and supply fans and replace exhaust fans in compressor rooms
Remodeling existing office space to include more individual offices, new finishes, and electrical modifications.
Install lights and receptacles in office area.
25-6225. Kemps 2nd floor office expansion. Moved around existing supply duct work in space for renovation. Moved return filter grill from south wall to east wall.
Hook up new equipment in freezer.
Wire 3 new ice cream pail fillers in production room.
Electrical for replacement of RTU @ Kemps facility. Job#14956009
Replacement of roof top cooling unit. Like for like replacement
Commercial Reroof- Fully adhered TPO membrane
Installing conduit, boxes, wire, communication cable for Gate and Controls.
Install conduit, boxes, and communication wire to the AEC for Ammonia detectors.
Compressor electrical requirements; dryer electrical requirements; machine shop panel re-feed electrical requirements