103
6
$100,523
1
INSTALL/REPLACE DAIKIN FURNACE AND AIR CONDITIONER
BASEMENT REMODEL TO FRAME PERIMETER WALLS IN PREPARATION FOR INSULATION WORK TO BE DONE IN EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN). APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT IS REQUIRED TO
MINOR BATHROOM REMODEL AT UNIT #14D - REMOVE AND REPLACE BATHTUB AND SURROUND. NO CHANGES TO WALLS OR CEILING, NO NEW OPENINGS. NO DISRUPTION TO EXISTING FIRE/SOUND SEPARATIONS. 2020 MN SBC/2020 MN ENERGY CODE (2018 IECC) occupancy: R-2 windows with
INSTALL EGRESS WINDOW AT NORTH SIDE OF HOUSE // 10' TO PROPERTY LINE ----- 2002 Minnesota State Building Code ----- ISSUANCE OF THIS PERMIT DOES NOT ALLOW DISTURBANCE-TO OR TRAVEL-ACROSS NEIGHBOR'S PRIVATE PROPERTY. ----- WHERE DEPTH OF EXCAVATION IS LESS
INSTALL ONE NEW CASEMENT EGRESS WINDOW WITH WELL USING EXISTING WINDOW WIDTH ON NORTH ELEVATION WALL OF EXISTING BASEMENT FLOOR OF A SINGLE FAMILY HOUSE. AAJ(PROJECT DOX PLAN). APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVI
Install interior partial perimeter draintile system
CONSTRUCT DETACHED 24' BY 22' WOOD FRAME GARAGE. GARAGE RETAINING WALL CONDITIONS: NO GENERAL COMMENTS: APPLICANT MUST LOCATE AND IDENTIFY THE PROPERTY STAKES AND CALL FOR INSPECTION FOR BUILDING INSPECTOR VERIFICATION BEFORE CONCRETE IS POURED. APPR
METER MOVE - Q4 2019 BATCH #02
FIXTURES FOR KITCHEN & NEW HALF BATHROOM ON MAIN FLOOR
FOR KITCHEN - ONE DUCT OPENING, DOWN DRAFT KITCHEN HOOD, & CAP COOKTOP GAS LINE(NO PERMIT NEEDED)
Install Mitsubishi Ductless System. MXZ5C42NAHZ
EXTENDING KITCHEN AND MODIFYING EXISTING BATHROOM. STRUCTURAL WORK. (JJL)*********************** ENGINEER: MATTSON MACDONALD YOUNG - JOSEPH CAIN #40119*********************** **********************ENGINEERING UPDATED 6.3.20 - SEE UPDATED ENGINEERED DR
REPLACE WINDOW WITH GLASS BLOCK. WINDOW IS NOT AN EGRESS WINDOW. (JJL)
NON LOAD BEARING WALL BEING RELOCATED IN BATHROOM. REMAINDER OF BATHROOM WORK TO HAVE SEPARATE PERMIT BY CONTRACTOR. WILL ALSO HAVE SEPARATE PERMIT FOR WINDOW REPLACEMENT. (JJL)*************** SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING,
Adding split system to a new garage.
2ND FLOOR BATHTUB AND 2 LAVS
Legalize Basement Bedrooms Alterations to existing basements or portions thereof shall have a ceiling height of not less than 6 feet 4 inches, including beams, girders, ducts or other obstructions. The creation of sleeping rooms or other habitable spac
CONSTRUCT THREE STALL DETACHED 22'0" BY 30'0" WOOD FRAME GARAGE PER HERITAGE PRESERVATION CERTIFICATE OF NO CHANGE APPROVAL. AAJ#2 ***NOTE: SEE ATTACHED INFORMATION BULLETIN FOR GARAGE WALL PROTECTION AND PORTAL FRAME WALL BRACE AT GARAGE DOOR OPENING PER
INSTALL BATH TUB, TOILET AND BATH SINK IN BASEMENT.
Install 6 Supply Air, 3 Return Air , 1 Bath Fan and venting.