Saint Paul, MN
Saint Paul, MN
Saint Paul, MN
400 SNELLING AVE N, Saint Paul
400 SNELLING AVE N, Saint Paul
Hook up of one pre-piped Ansul R-102 fire suppression system into pre-piped kitchen hoods.
400 SNELLING AVE N, Saint Paul
Add heat to 2 players benches and 1 entrance tent. 1-100# cylinder on each bench 1-420# cylinder on the tent
400 SNELLING AVE N, Saint Paul
Permit Extension. 120ft sidewalk closure on Pascal St N between University Ave W and St Anthony Ave. Pedestrian detour posted.120ft Bike lane closure. Natural gas installation project. Directional bore approx 1500 ft of 4" PE through ROW for temp and permanent use for multiple buildings at United Pavilion development. Tie in near Pascal St and Shields Ave intersection, bore across north side of Shields Ave ROW corridor, cross to west side of Simpson, continue to north side of Spruce Tree, continue west along north side of Spruce Tree ending project short of Snelling Ave intersection.
400 SNELLING AVE N, Saint Paul
Install new kitchen equipment and receptacles (4) circuits. PEC #80767 - S. Johnson
400 SNELLING AVE N, Saint Paul
Connect 1 - 100# cylinder to 1 - 175,000btu heater at each bench for player heat.
400 SNELLING AVE N, Saint Paul
Lane closure on NB Snelling Ave N between St Anthony Ave and Spruce Tree Dr. Full Road Closure of Central Ave between Snelling Ave and Asbury St N. Closure on Snelling Ave only allowed 9am - 3pm. Do not obstruct or close sidewalk without TPAR and permit amendment. Request for potholing only for location of utilities to inform future work in ROW design. Proposed project route starts at NE corner of the intersection of Spruce Tree Ave and end in SE corner of intersection of Snelling Ave North/MN-51 south to Central Ave.
1400 SNELLING AVE N, Saint Paul
Furnace and AC replacement.
1400 SNELLING AVE N, Saint Paul
AC and Furnace reconnect. Swap 25A breaker for 20A.
1400 SNELLING AVE N, Saint Paul
Furnace/AC replacement
1400 SNELLING AVE N, Saint Paul
Furnace and AC replacement.
400 SNELLING AVE N, Saint Paul
Smoke during potential 12/6/25 MNUFC last season game.
400 SNELLING AVE N, Saint Paul
120ft sidewalk closure on Pascal St N between University Ave W and St Anthony Ave. Pedestrian detour posted.120ft Bike lane closure. Natural gas installation project. Directional bore approx 1500 ft of 4" PE through ROW for temp and permanent use for multiple buildings at United Pavilion development. Tie in near Pascal St and Shields Ave intersection, bore across north side of Shields Ave ROW corridor, cross to west side of Simpson, continue to north side of Spruce Tree, continue west along north side of Spruce Tree ending project short of Snelling Ave intersection.
400 SNELLING AVE N, Saint Paul
Fireworks for 2025 MLS Playoffs at Allianz Field
400 SNELLING AVE N, Saint Paul
Proposed storm MH over main and stub to PL. MH shops approved prior to permit submittals.
400 SNELLING AVE N, Saint Paul
Sanitary stub - 8" Sanitary Service With 48" MH, tying into existing public MH at main.
400 SNELLING AVE N, Saint Paul
Proposed public 48" MH over main with 6" Sanitary Stub to PL. MH shops approved prior to permit submission.
400 SNELLING AVE N, Saint Paul
Fireworks for all 2025 MNUFC Playoffs at Allianz Field
400 SNELLING AVE N, Saint Paul
Allianz Field - Pyrotechnic Display for MNUFC Game on 10/4/25
400 SNELLING AVE N, Saint Paul
Connect lp gas to heater for tent.
400 SNELLING AVE N, Saint Paul
1400 SNELLING AVE N, Saint Paul
400 SNELLING AVE N, Saint Paul
TEMP. TENT STRUCTURE 30' X 80' BEING BUILT ON JUNE 13TH, FOR A PRE-GAME PICNIC ON JUNE 14TH, AND REMOVED THE MORNING OF JUNE 15TH. * Plans emailed to applicant, Jennifer Smalley at jsmalley@ue-mn.com, 06-13-2025* MV
400 SNELLING AVE N, Saint Paul
1400 SNELLING AVE N, Saint Paul
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.