Maple Grove, MN
Maple Grove, MN
Three Scimed Pl N, Maple Grove
Remodel, Relocate (6) concealed pendant sprinklers due to ceiling and wall changes for EEG Robotics Lab Room.
Three Scimed Pl N, Maple Grove
Remodel, Ductwork for thermal oxidizer
Three Scimed Pl N, Maple Grove
Alteration, Remodeling existing lab space to lab space.
4 Scimed Pl N, Maple Grove
Remodel, relocate existing circuits to new equipment locations and add circuits to feed owner equipment.
4 Scimed Pl N, Maple Grove
Add, WL4 PASSIVATOR CO2 SYSTEM. ADD FIRE ALARM RELAYS TO INTEGRATE WITH BUILDING FA SYSTEM.
4 Scimed Pl N, Maple Grove
Remodel, WL4 PASSIVATOR CO2 SYSTEM. ADD FIRE ALARM RELAYS TO INTEGRATE WITH BUILDING FA SYSTEM.
Two Scimed Pl N, Maple Grove
Remodel, WL2 Bathroom Fixture Replacements
Two Scimed Pl N, Maple Grove
Remodel, Elec connections to permanent thermal oxidizer behind bldg
Three Scimed Pl N, Maple Grove
Remodel
Three Scimed Pl N, Maple Grove
Remodel, 700 sq ft lab remodel on 1st floor
4 Scimed Pl N, Maple Grove
New, installing BDA DAS system in new building 4
Three Scimed Pl N, Maple Grove
Add, Electrical connections to Next Gen Heat Set Equipment
Three Scimed Pl N, Maple Grove
Remodel, WL3 L1 N Bathroom- Fixture Replacement
Three Scimed Pl N, Maple Grove
Alteration, Existing Lab Remodel
Two Scimed Pl N, Maple Grove
Remodel, Replace existing semi-recessed pendant sprinklers with concealed sprinklers and relocate as required
Three Scimed Pl N, Maple Grove
Repair, Replace piping with leaks and add automatic air vent to system.
Two Scimed Pl N Wl2, Maple Grove
Remodel, WL2, 2ND FLOOR ADSA EXPANSION/REMODEL. (lVC#2201492)
Two Scimed Pl N, Maple Grove
Remodel, WL2, 2ND FLOOR ADSA EXPANSION/REMODEL. (LVC# 2201492)
Two Scimed Pl N, Maple Grove
Add, Temp Control Wiring DDC Controls - Boston Sci WL2 ADSA Expansion - Uhl 022TC294
Two Scimed Pl N, Maple Grove
Interior Finish, WL2 ADSA- Gowning Room Remodel
Two Scimed Pl N, Maple Grove
Remodel
Two Scimed Pl N, Maple Grove
Remodel, WL2 ADSA Expansion- Ductwork Re-Model
Two Scimed Pl N, Maple Grove
Add, Boston Sci WL2 Pull Temporary Thermal Oxidizer into existing campus BAS- Uhl 022TC302
Two Scimed Pl N, Maple Grove
New, Connecting 15ft of pipe from the city temp gas meter to a Temporarily thermal oxider
Two Scimed Pl N, Maple Grove
Remodel, 8000 sq ft lab buildout
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.