Two Scimed Pl N, Maple Grove
Alteration, Building 2 Level 2 Mechanical Shaft for Laser Renovation
Two Scimed Pl N, Maple Grove
Remodel, Replace Rooftop Unit
Three Scimed Pl N, Maple Grove
Remodel, Switch (8) pendant sprinklers to concealed in office area being remodeled.
Two Scimed Pl N, Maple Grove
Remodel, Change (10) existing semi-recessed sprinklers to concealed pendants and adjust locations.
Two Scimed Pl N, Maple Grove
Add, Install one speaker strobe 1901177
One Scimed Pl N, Maple Grove
Add, Extension of the remodeled space on 2nd floor WL-3. Relocate existing speaker strobes, add new speak
Three Scimed Pl N, Maple Grove
Remodel, Level 2 Structural Heart Production Area - Remodel
Three Scimed Pl N, Maple Grove
New, Temperature Control Wiring-DDC Controls. Boston Sci WL3 Structural Heart Lab - Uhl Job 019TC083
Two Scimed Pl N, Maple Grove
Remodel, Install one speaker strobe 1901177
TWO Scimed Pl N, Maple Grove
Alteration, Building 2 Level 2 Renovations to the Japan Training Room
Two Scimed Pl N, Maple Grove
Remodel, Training room remodel
One Scimed Pl N, Maple Grove
Remodel, Add one new speaker strobes and relocate 2 speaker strobes in remodeled space in WL-3 2nd floor just
One Scimed Pl N, Maple Grove
Add, Add one Speaker Strobe 1900200
One Scimed Pl N, Maple Grove
Remodel, Add one Speaker Strobe 1900200
Three Scimed Pl N, Maple Grove
Remodel, Add one new speaker strobes and relocate 2 speaker strobes in remodeled space in WL-3 2nd floor just
One Scimed Pl N, Maple Grove
Remodel, Extension of the remodeled space on 2nd floor WL-3. Relocate existing speaker strobes, add new speak
Two Scimed Pl N, Maple Grove
Add, Add duct smoke detectors to 53 new RTUs 1900089
Two Scimed Pl N, Maple Grove
Add, Add duct smoke detectors to 53 new RTUs 1900089
Three Scimed Pl N, Maple Grove
Remodel, Level 2 Structural Heart Production Area - Remodel
Three Scimed Pl N, Maple Grove
Remodel, add ductwork and diffusers to existing HVAC system.
Three Scimed Pl N, Maple Grove
Remodel, Replace semi-recessed sprinklers with concealed and relocate as needed for coverage.
Three Scimed Pl N, Maple Grove
Remodel, Remodel shell space sprinkler system for new Structural Heart Lab space build-out.
Three Scimed Pl N, Maple Grove
Remodel, Relocate 3 existing sprinklers in the 1st Floor Nitonal Lab Area.
Two Scimed Pl N, Maple Grove
Remodel, Add (2) standard spray quick response pendants in new office in 1st Floor Machine Room.
One Scimed Pl N, Maple Grove
Remodel, Provide new VAV and ducting to War Room