Minneapolis, MN
Minneapolis, MN
3932 18TH AVE S, Minneapolis
Install Bath Fan
5054 18TH AVE S, Minneapolis
REPLACE 2.5 TON A/C
1009 18TH AVE NE, Minneapolis
Meter Move Q3-2017 Batch #11
1010 18TH AVE NE, Minneapolis
Meter Move Q3-2017 Batch #11
1019 18TH AVE NE, Minneapolis
Meter Move Q3-2017 Batch #11
1034 18TH AVE NE, Minneapolis
Meter Move Q3-2017 Batch #11
1036 18TH AVE NE, Minneapolis
Meter Move Q3-2017 Batch #11
1040 18TH AVE NE, Minneapolis
Meter Move Q3-2017 Batch #11
1104 18TH AVE NE, Minneapolis
Meter Move Q3-2017 Batch #11
1115 18TH AVE NE, Minneapolis
Meter Move Q3-2017 Batch #11
1114 18TH AVE NE, Minneapolis
Meter Move Q3-2017 Batch #11
1044 18TH AVE NE, Minneapolis
Meter Move Q3-2017 Batch #11
948 18TH AVE NE, Minneapolis
Meter Move Q3-2017 Batch #11
5000 18TH AVE S, Minneapolis
Replacing water heater
3724 18TH AVE S, Minneapolis
NEW DETACHED GARAGE (JJL) MPLS GARAGE BUILDERS CONSTRUCT DETACHED _ WOOD FRAME GARAGE. GENERAL COMMENTS: APPLICANT MUST LOCATE AND IDENTIFY THE PROPERTY STAKES AND CALL FOR INSPECTION FOR BUILDING INSPECTOR VERIFICATION BEFORE CONCRETE IS POURED.
2609 18TH AVE S, Minneapolis
Tub replacement
2609 18TH AVE S, Minneapolis
BATHROOM REMODEL AT SFD (MAA #02) SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQUIRED IN ACCORDANCE WITH MN. STAT. 299F.50 IRC 313.2.1. When interior alterations, r
4415 18TH AVE S, Minneapolis
GAS DRYER
3933 18TH AVE S, Minneapolis
REPLACE GAS RANGE
3932 18TH AVE S, Minneapolis
2nd floor bath remodel.
4415 18TH AVE S, Minneapolis
REPLACEMENT WINDOWS - 1 AT BASEMENT AND 2 AT UPPER LEVEL
3142 18TH AVE S, Minneapolis
Replacing 16 windows in existing rough openings. 4 replaced on 1st floor; 8 replaced on 2nd floor; 4 replaced in attic.
4440 18TH AVE S, Minneapolis
Install kitchen hood
4716 18TH AVE S, Minneapolis
gas dryer
3932 18TH AVE S, Minneapolis
NON-STRUCTURAL BATHROOM REMODEL TO SFD INCLUDING REMOVAL OF EXISTING FINISHES. (sza) INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR WALL CONDITIONS. NO WINDOW REPLACEMENT 6'-8'' MIN. FINISHED HEADROOM CLEARANCE MUST BE PROVIDED IN BATHROOMS AND AT F
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.