Edina, MN
Edina, MN
3510 Galleria, Edina
Maintenance/Repair/Replace, End Date:Start:6/20/2024
3510 Galleria, Edina
Alteration/Remodel, Fire alarm modifications and installation, end date:6/30/2024
3510 Galleria 3462, Edina
Alteration/Remodel, Adding hand washing sink
3510 Galleria 3462, Edina
New Tenant Finish, Chocolate Moonshine Co
3510 Galleria 3230, Edina
Maintenance/Repair/Replace, Water Softener
3510 Galleria, Edina
Maintenance/Repair/Replace, ,End:5/20/2024
3510 Galleria 3512, Edina
Maintenance/Repair/Replace, End Date:Start:5/22/202
3510 Galleria, Edina
Maintenance/Repair/Replace, ,End:5/17/2024
3510 Galleria, Edina
Maintenance/Repair/Replace, End:5/13/202
3510 Galleria, Edina
Addition, Renovation of the existing center to create new vanilla shell spaces for new in-line tenants
3510 Galleria, Edina
Alteration/Remodel, Remodel of retail mall space.
3510 Galleria 3525, Edina
Alteration/Remodel, Fire Alarm Modifications, end date:6/30/2024
3510 Galleria 3203, Edina
Maintenance/Repair/Replace, End Date:Start:4/14/2024,End:4/15/2024, Start Time:10:30 PM, the End Time:4:30 AM
3510 Galleria 3260, Edina
Alteration/Remodel, Fire Alarm Modfications, end date:5/8/2024,
3510 Galleria 3525, Edina
Alteration/Remodel, add 1 in tolet, relocate 2 for coverage End date:3/8/2024, Number of Heads:
3510 Galleria 3260, Edina
Alteration/Remodel, new walls and ceilings, End date:4/5/2024, Number of Heads:41
3510 Galleria 3260, Edina
New, wall sign on Parking Ramp
3510 Galleria 3260, Edina
Alteration/Remodel, 1-water closet 1-lav, 1-ADA wall hung water closet, 1-waterline serving fridge, 1-ADA wall hung lav
3510 Galleria 3260, Edina
Alteration/Remodel, Revise ductwork layout to fit new store design
3510 Galleria, Edina
Maintenance/Repair/Replace, End Date:Start:3/12/2024,End:3/13/2024, Start Time:9:30 PM, the End Time:6:00 AM
3510 Galleria, Edina
Special Events Inspection
3510 Galleria, Edina
Alteration/Remodel, Vent restroom and dryer
3510 Galleria 3260, Edina
Alteration/Remodel, interior tenant improvement
3510 Galleria, Edina
Maintenance/Repair/Replace, ,End:2/13/2024, Start Time:8:00 PM, the End Time:1:30 AM
3510 Galleria 3525, Edina
Alteration/Remodel, remodeling bathroom and sink
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.