Saint Paul, MN
Saint Paul, MN
59
11
$4,835,577
1
This project consists of 6,800 sf of renovated spaces of lobby space, check-in desk, security desk, welcome desk, waiting room, behavioral health space along with triage, fast track and calming rooms with restrooms and staffing areas. The new entrance vestibule and all exterior work shown on plans is not part of this permit. Separate permits for will be submitted at a later date.
Remodel Children's ED & Entry
Children’s – St. Paul ED Front Entrance Remodel: Description – Demolition of existing restrooms and exam rooms. Connect to existing plumbing services and install plumbing system to new restrooms, exam rooms and misc. rooms. (5) water closets (5) lavatories (9) sinks (1) electric water cooler (5) floor drains
JOB 820628 CHILDRENS ED AND FRONT ENTRANCE EXPANSION
Remodel Children's ED & Entry
Remodel of existing emergency department of Children's Hospital including equipment/duct demo and new GRD's, Fan, VAV's and Air Curtains.
Demolition of VAV's in Emergency department and connect to the existing hydronic system and install new piping and VAV's.
remove medical equipment of an iMRI machine out of United Hospital. We’ll be providing shoring on the floor below during removal of the equipment. We’ll be removing the chiller from the roof and quench vent. Interior work is minimal, removing four doors, frames and header for equipment removal vendor to have 8’x8’ clearances. There is an exterior door we’ll be removing to get the equipment outside
Temperature control installation
TAKING FOUR ROOMS AND UPDATING TO BE SAFE ROOMS BY ADDING ANTI-LIGATURE COILING DOORS, FIXTURES IN RESTROOM AND THROUGHOUT THE PATIENT ROOMS. ALSO BUILDING OUT A SENSORY ROOM WITH PADDED WALLS ETC.
REMOVE AND REPLACE (6) COOLING TOWERS.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.