Saint Cloud, MN
Saint Cloud, MN
Saint Cloud, MN
3333 DIVISION ST, Saint Cloud
Installing a new MUA unit for the pool area.
3333 DIVISION ST, Saint Cloud
WITHIN EXISTING GROCERY MERCANTILE SPACE- SUITE 140- ADD SMALL COMMERCIAL KITCHEN TO STORAGE ROOM FOR MEAT CUTTING PROCESS.
3333 DIVISION ST, Saint Cloud
Unit 105 at the Midtown Mall. Reconfiguration of ductwork and addition of two exhaust fans.
3333 DIVISION ST, Saint Cloud
UNIT 146: OFFICE WIRING
3333 DIVISION ST, Saint Cloud
Suite 146 Cosmetic remodel demo-2 interior walls. New framing for 3 offices. with doors.
3333 DIVISION ST, Saint Cloud
Suite 105A: new frame, lobby outlets, 2 bathrooms wiring
3333 DIVISION ST, Saint Cloud
Suite 141, Furniture store. Replace lights + connect new furnace
3333 DIVISION ST, Saint Cloud
Ste 141. Interior cosmetic renovation, including installation of new flooring, painting of walls and ceilings, and associated minor finish work. Combining 3 existing suites into single suite (10'-0" opening between new suite 141A and 141B).
3333 DIVISION ST, Saint Cloud
Progress to extend forced air supply/return trunk from mechanical space, through corridor, to tenant space. Fire dampers with sleeves, angles, and access doors at corridor. Extend forced air supply trunk the extent of the tenant space. Supply saddles cut to side of supply duct with commercial grade registers per design. Central return termination with wire mesh. Bryant 916S forced air gas furnace with Bryant 134SAN air conditioning with matched coil and roof located condenser. Gas connection to adjoining space furnace main. Condensate to place of disposal. PVC vent piping through the roof .
3333 DIVISION ST, Saint Cloud
UNIT 105: HALLS AND 2 BATHROOMS Nikolay (773) 580-4938 can meet inspector
3333 DIVISION ST, Saint Cloud
Scope: Add (1) exhaust fan and a little ductwork alteration.
3333 DIVISION ST, Saint Cloud
UNIT 124 event center: 30 lights, few outlets, 2 exit signs
3333 DIVISION ST, Saint Cloud
UNIT 142 connect a new water heater
3333 DIVISION ST, Saint Cloud
Cosmetic Renovation of Restrooms. Remove existing finishes, drywall and plumbing fixtures. Install new drywall, finishes and plumbing fixtures in same locations.
3333 DIVISION ST, Saint Cloud
Building Improvement Project- Adding Exterior Windows and Doors to the Building. Tenant Improvement Project on the 1st and 2nd Level Northwest Corner of Midtown Square Mall. Renovate existing suite 105 - create demising walls for 3 smaller tenant spaces. Suite 105A - Swim school for all ages consisting of reception area, waiting area, 2 changing rooms, shower, pool, 2 staff changing rooms, mechanical room and men's & women's restrooms. Suite 105C - Consists of inflatable jump/slide equipment room and arcade game room. Other tenant space (105B) currently vacant. Remodel suite 205 - create demising walls to make 2 smaller tenant spaces currently vacant. Existing wood framed interior walls shall be removed. New non-load bearing metal stud framing throughout TI's. Existing MEP to remain. Existing restrooms in common spaces to remain.
3333 DIVISION ST, Saint Cloud
remodel mens and womens restrooms outside Midtown Bar next to suite 125.
3333 DIVISION ST, Saint Cloud
Install exposed spiral ducting in the event center from two existing rooftop units. Midtown Square plans to remove the grid and expose the ceiling in their “ballroom.” Related to this work, some of the existing ductwork will need to be altered to accommodate the new open-ceiling design. The occupancy and use of the space will remain unchanged.
3333 DIVISION ST, Saint Cloud
(2) Bathroom Remodels Located On The First Floor. Replacing Old Fixtures With New Fixtures (Same Locations).
3333 DIVISION ST, Saint Cloud
reroof southwest corner of the building 120 feet by 140 feet. Remove existing roch aside to place new roofing materials such as Mule Hide 60mil EPDM and new foam
3333 DIVISION ST, Saint Cloud
Unit #140 - Future grocery market -Extending forced air supply ductwork (single piece of equipment) for a grocery.
3333 DIVISION ST, Saint Cloud
Suite 140, 4 outlets + 2 switches in new frame, subpanel
3333 DIVISION ST, Saint Cloud
Suite 142, 6 outlets in new frame
3333 DIVISION ST, Saint Cloud
Unit # 142 NO EQUIPMENT REPLACEMENT. JUST VENT/DUCT ALTERATION TO CURRENT EQUIPMENT. Extend exposed split system and AHU rectangular forced air supply trunk the extent of the tenant space. Supply saddles cut to side of supply trunk with commercial grade registers per design in ax throwing area. Re-connect existing entryway supply registers, (1) ceiling lay-in supply register in kitchen area, and (2) 36x12” commercial grade sidewall return grilles. Reconfigured restroom exhaust terminations with insulated roof curb, replacement flex with hard pipe, and terminations with backdraft dampers.
3333 DIVISION ST, Saint Cloud
Add a circuit for new Kalsan Cuisine (Suite 127B) sign.
3333 DIVISION ST, Saint Cloud
Interior remodel for new tenants on 1st level in southwest corner of Midtown Square Mall. Renovate suite 140 for new grocery store. Grocery store to consist of: retail area, office and dry storage room. Renovate suite 142 for new axe throwing venue. Axe throwing venue to consist of: seating area, kitchen and electrical room. No work in other tenant spaces or corridors will be done under this permit. Separate permits are required for those spaces.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.