Minneapolis, MN
Minneapolis, MN
172
16
$14,699,635
16th floor interior demo certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC sprinklered: yes Tenant: SPS Commerce Floor(s): 16 architect: Nelson engineer:
REMODEL TO EXISTING 5,274 S.F OFFICE SPACE. DEMO EXISTNIG PARTITION WALLS FOR OPEN OFFICE FLOOR PLAN. NEW PARTITION WALLS FOR SMALL CONF. ROOM, EMPLOYEE KITCHEN, 2 SMALL OFFICES (DMH#1) AND TECHNOLOGY ROOM. NO CHANGE IN EXITING OR CORRIDOR. Const
SUITE 1100 - OFFICE REMODEL certificate of occupancy required: no special inspections required: no const type: IIB occupancy: B 2015 MSBC occupant load: sprinklered: yes Tenant: LumiData Floor(s): 11 architect: Genes
structural repair to rafter tails required additional support for addition
21ST FLOOR WEST - REPLACE DIFFUSERS (for new open ceiling)
break room sink
21ST FLOOR EAST - REPLACE DIFFUSERS FOR OPEN CEILING - RESTROOM EXHAUST
Temp Heat - CBRE event - 333 7th Street S One (1) LP heat source - 170,000 BTU
Remodel interior office space certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC occupant load: 116 sprinklered: yes Tenant: Home Services of America, Inc. Floor(s):
FOR 21ST FLOOR SPEC/SHOW SUITE: INSTALL BREAKROOM SINK
REMODEL CORE AND SOUTH TENANT 21ST FLR AND 22RD FLR CORE AND SOUTH TENANT FINISHES AT OFFICE TOWER (JAG) TWO ACCESSORY A-3 ROOF PATIOS APPROX 938 SF AND 63 OCCUPANTS NON-SEPARATED ON 21ST FLOOR. ADDING ACCESSIBLE SINGLE USE RESTROOM IN CORE ON 21ST FLOO
21ST FLOOR - RELOCATE DIFFUSERS
TENANT FIT OUT Suite 2330 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC occupant load: sprinklered: yes Tenant: Parr McKnight Floor(s): 23 architect:
21st FLOOR DEMO IN PREPARATION FOR FUTURE REMODELING. SCK#2
FOR 21ST FLOOR BREAKROOM - INSTALL SINK
replace/relocate diffusers Suite 2330
REMODEL APPROX 3000 SQ FT OF OFFICE SPACE ON 21ST FLOOR. SCK#1
FOR SUITE 2330 BREAKROOM - SINK, FLOOR DRAIN, DISHWASHER, COFFEE MAKER, AND ELECTRIC WATER HEATER
interior demo and white box finishes in office suite 1160.
MINOR IMTERIOR REMODEL OF OFFICE AT 3RD FLOOR (MAA#02)
16TH FLOOR DEMO, PAINTING AND LIGHTING IN PREP FOR FUTURE TENANT BUILDOUT. SCK#1
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.