Minneapolis, MN
Minneapolis, MN
172
16
$14,699,635
Selective demo within 5th floor. Install waste, vent, and water piping per MN Plbg Code for (2) single use restrooms, (2) breakroom sk, (1) water cooler and (1) wellness room sk. (3) tankless & (1) 6 gallon water heaters
remodel all tenant areas 5th floor for single tenant SPS Commerce certificate of occupancy required: no special inspections required: no const type: 1-A occupancy: A-3, B 2020 MSBC occupant load: 374 sprinklered: yes 20
2ND FLOOR REMODEL OF EXISTING TWO FAMILY DWELLINGS. AAJ (PROJECT DOX PLANS AND DOCUMENT). DEMOLITIONM WORK: - REMOVE PARTIAL SECTION OF EXTERIOR WALLS, WINDOWS AND ROOF TO ALLOW FOR MODIFICATION WORK ON 2ND FLOOR TO CREATE NEW MASTER BEDROOM SUITE
2 NEW WINDOWS AND REPLACE 3 IN EXISTING OPENINGS (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE
Replace 2 windows
Install 5 windows in existing openings
METER MOVE Q2 - 2021 BATCH #3
METER MOVE Q2 - 2021 BATCH #3
METER MOVE Q2 - 2021 BATCH #3
HVAC system rework existing system for new office layout adding one VAV box, GRD's and all associated ductwork. Refer to attached drawings.
HVAC system, rework existing system adding GRD's and all associated ductwork. Refer to attached drawings.
office remodel suite 2100 certificate of occupancy required: no special inspections required: no const type: I-A occupancy: B 2020 MSBC occupant load: 106 in work area sprinklered: yes 20% accessibility upgrades___Tena
23RD FLOOR. OFFICE EXPANSION. SUITE 2330. NO STRUCTURAL WORK. (JJL) certificate of occupancy required: no ***** special inspections required: no***** const type: IA ***occupancy: B ***2020 MSBC***** occupant load: 53
Install Owens Corning Tru Def - Duration shingles on House and Garage
80% boiler swap with near boiler piping replaced
Remove and replace (1) window, same size.
Replace 40 gallon gas water heater.
Interior remodeling phase 2 9th floor certificate of occupancy required: no const type: I-A occupancy: A-3, B 2020 MSBC occupant load: 477 total on 9th floor. See AN-1 for horizontal exit sprinklered: yes Tenant: SPS
Whole floor remodeling certificate of occupancy required: NO special inspections required: YES - FIRE RATED PENTRATIONS const type: I-A occupancy: B 2020 MSBC occupant load: NO CHANGE sprinklered: YES Tenant: Floor(s):
9th Floor- install of (2) water closets, (2) lav sinks, (2) break room sinks,(1) water cooler, (1) dishwasher, (1) coffee (1) floor drain, (1) water heater.
Tenant Improvement of HVAC system utilizing existing VAV boxes and adding one new VAV box, supply diffusers, return grilles and all associated duct work. Refer to attached drawings.
Build-out partial 9th floor Toilets, Office and Training certificate of occupancy required: no const type: I-A occupancy: A-3, B 2020 MSBC occupant load: 204 sprinklered: yes energy code chapter used: 1323 elevator revie
remodel existing restroom 9th floor, install (6) lav sinks (2) urinals, (6) water closets
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.