Minneapolis, MN
Minneapolis, MN
172
16
$14,699,635
1
Reinstall (3) existing diffusers for ceiling modifications. Relocate (1) thermostat. No new equipment or distribution. per approved plan.
Interior Remodel - lobby, skyway, & coffee shop special inspections required: no occupancy: B 2020 MSBC sprinklered: yes architect: Douglas Kahl #53844
BLDG1083625
REMODEL 'ACCENTURE' 17TH FLOOR 2020 MSBC architect: 59043 - Olsen, Kimberly Lauren
INSTALL 1 SINK AT EXISTING ROUGH IN AND 3 SINKS WITH NEW WASTE, VENT, CW & HW PIPING
Reroof of main house and detached garage
remove and replace siding on house
Reroof house and detached garage
Tear off and reroof house and detached garage. Remove chimney from roofline down.
TEAR OFF AND RE-ROOF HOUSE & GARAGE. OTHERS REMOVING AND REINSTALLING SOLAR PANELS
Tear off and re-roof, asphalt shingles, house and detached garage totaling 32sq.
Will send copy of contract. Ardy Alteration of HVAC system will use building existing equipment and will add four fan-powered boxes, heating hot water piping, GRDs and all associated ductwork per approved plans.
Install seven (7) new 1-comp break room sinks, 2-WC, 2-lavatories & 2 floor drains at new rough-in. Remove and replace at existing RI, 6-WC, 2-Urinals & 4-Lavatories
Residing left side elevation of the garage
(DMH-ProjectDox) BATHROOM REMODEL IN SFD.. REPLACE FIXTURES IN SAME LOCATIONS. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE FINISHES AT BATHTUB/SHOWER LOCATIONS.
Demo existing fixtures. Install a new Bath tub and tub valve. Hook drain into existing drain and bring up to code if necessary. Install a new vanity faucet, and toilet.
REMODEL SUITE AT 19TH & 20TH TO SPEC SUITE const type: IIB occupancy: B 2020 MSBC sprinklered: YES architect: Foley, Aaron Michael - 61778
Install new tankless water heater and upsize gas piping Install new sediment filter on main water
HVAC alteration to accommodate the new layout. Reusing fan-powered, VAV boxes, and adding one new fan-coil unit. GRDs and all associated ductwork per approved plans.
Install 2 VAV boxes
Tear off and reroof house roof and garage roof.
replace water heater
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.