Minneapolis, MN
Minneapolis, MN
157
6
$113,777
1
Tear-off and install new shingle roofing system
Replace furnace
Install new fixtures in existing locations in 2nd floor hall bath
NON-STRUCTURAL REMODEL AT 2ND FLOOR HALL BATHROOM - DEMO FIXTURES AND FINISHES TO STUDS, INSTALL WALK-IN SHOWER, WC, AND LAV. INSTALL "SCHLUTER SHOWER SYSTEM" WATERPROOF TILED SHOWER ENCLOSURE IN ACCORDANCE WITH MANUFACTURER'S PUBLISHED INSTRUCTIONS (WHI
Venting, 2 bath fans, Hood vent REVIEW NOTE: Permit application lists gas piping to a stove. Gas work to cooking appliances is covered under a plumbing permit. A separate plumbing permit is require for this work.d
(DMH-ProjectDox) MASTER BATHROOM REMODEL IN SFD. EXISTING TEMPERED WINDOW. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE FINISHES AT BATHTUB/SHOWER LOCATIONS. WAT
Vent added bath exhaust fan to the exterior of the home from the water closet area. Fan provided BY OTHERS. Remove existing radiant infloor and re-install with new manifold.
install egress window. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALARMS REQUIRED IN ACCORDANCE WIT
REMODEL KITCHEN AND 2 BATHROOMS. ENGINEER TO DESIGN SOME MODIFICATIONS ONCE FINISH MATERIALS ARE REMOVED. (JJL) ENGINEER: DAVID MACDONALD #14751 Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMIT
Shingle re-roof for 5 plus units
DIRECT REPLACEMENT BASEMENT UNICO UNIT AND OUTDOOR CONDENSER CARRIER 1.5 TON CONDENSER M#24SPA618W003 UNICO COOLING MODULE M#M1218CL2-E UNICO BLOWER MODULE M#M1218BL1-EC2 AHRI#211104083 BTU/h 15300
REPLACE 2 AIR HANDLERS(5 TON & 2 TON) W/CONDENSORS - Replacement of existing only: Install 5 Ton Air Handler Bryant FJ4DNXD60L00 in attic. Install Bryant Condenser 115SAN060OOW on grade. Install 2 ton air handler Bryant FJ4DNXB24LOO in basement. Install
run gas line to fireplace and vent
Tear off and replace asphalt shingles.
REMOVE WALL WITH ENGINEER Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALARMS REQUIRED IN ACCORDA
Installation of GAF Timberline HDZ shingles on your House 60Mil EPDM Rubber Flat Roofing System on Low Sloped
Tear off and replace shingle roof system, replace EPDM Flat roof, replace flat seam, replace Built in gutters.
175000 BTU REPLACEMENT BOILER
Tear off EPDM roof and install new 60 mil membrane
JOIST REPAIR. ENGINEER TO REVIEW CONSTRUCTION AND PROVIDE LETTER TO MINNEAPOLIS INSPECTOR STATING CONSTRUCTION MEETS CURRENT DESIGN LOADS. MINNEAPOLIS INSPECTOR WILL NOT CLOSE PERMIT UNTIL LETTER HAS BEEN RECIEVED. (JJL) ENGINEER: THOMAS A WEBER #47360
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.