Minneapolis, MN
Minneapolis, MN
5445 26TH AVE S, Minneapolis
Installation of GAF Timberline HDZ shingles on House
3506 6TH ST N, Minneapolis
replace water heater
3506 6TH ST N, Minneapolis
replace replace replace and duct work
3535 26TH AVE S, Minneapolis
Reside of 20sq house and garage
610 6TH AVE SE, Minneapolis
Replace Gas Range
120 6TH ST S, Minneapolis
install dishwasher in law office
4800 6TH ST N, Minneapolis
REMODEL 2 BATHROOMS ADD 2 EGRESS WINDOWS (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALARMS R
50 6TH ST S, Minneapolis
add small conference room on 22nd floor. certificate of occupancy required: no const type:1a occupancy: b 2020 MSBC sprinklered: yes architect: Wold Architects
4800 6TH ST N, Minneapolis
Siding for house and garage
1217 36TH AVE NE, Minneapolis
REPLACE FURNACE
345 6TH AVE N #402, Minneapolis
Remove CPVC water piping to bathrooms and replace with PEX water supply piping. Install new shower valve. Install piping for new rain water head. Remove existing shower drain and install new pan liner and drain assembly. Replace double vanity drain p
5453 26TH AVE S, Minneapolis
METER MOVE Q1 - 2026 BATCH #1
3211 6TH ST N, Minneapolis
METER MOVE Q1 - 2026 BATCH #1
5428 26TH AVE S, Minneapolis
METER MOVE Q1 - 2026 BATCH #1
10 26TH ST E #320, Minneapolis
replace furnace
4012 16TH AVE S, Minneapolis
kitchen sink
1027 26TH AVE SE, Minneapolis
ADD BATHROOM TO BASEMENT, RELOCATE EXISTING LAUNDRY ROOM. (JJL) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK
718 6TH ST SE, Minneapolis
Replace Gas Dryer
3420 46TH AVE S, Minneapolis
Replacement water heater
4529 46TH AVE S, Minneapolis
Top Floor Full Bathroom: Install 1- Tub, 1- Toilet, 2- Lav Sinks.
3601 36TH AVE S, Minneapolis
REPLACE FURNACE
225 6TH ST S, Minneapolis
HVAC alterations include modifying the existing distribution system through the current air handling units, reusing existing and adding new fan-powered and VAV boxes to suit the new floor layout, GRDs, and all associated ductwork as per the approved plans
1627 36TH AVE NE, Minneapolis
MAIN FLOOR BATHROOM REMODEL WORK IN EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN, DOCUMENTS AND PHOTOS) DEMOLITION WORK: - INTERIRO DEMOLITION WORK TO REMOVE EXISTING TUB/SHOWER UNIT WITH PANELS TO STUDS AS WELL AS REMOVE DRYWALL ON CEILING
3515 26TH ST E, Minneapolis
NON-STRUCTURAL BASEMENT FLOOR REMODEL WORK FOR REMOVAL OF MOLD AND WORK BENCH IN EXISTING SINGLE FAMILY HOUSE. AAJ (PROJECT DOX PLAN_ ***NOTE: PER APPLICANT, ADDITIONAL REPAIR WORKS OTHER THAN THIS SCOPE OF WORK WILL BE DONE BY BBUILDING OWNER. TH
591 36TH AVE NE, Minneapolis
(DMH-Pdox) BASEMENT EGRESS WINDOW & WELL TO SIDE YARD OF SFD AND FINISH FOR BASEMENT BEDROOM & BATHROOM, REQUIRED: EXISTING STAIRWAY TO BASEMENT TO MEET MINIMUM CONTINUOUS 6'-4" HEADROOM, 30" WIDTH,8"MAX. RISE, 9" MIN. TREAD. BASEMENT TO MEET6'-4"
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.