Minneapolis, MN
Minneapolis, MN
143
2
2
Extend air handling pipe for fan and add heating duct to the bathroom, connecting existing hot air duct in Utility Room into the new wall for the bathroom. Replace foil dryer vent pipe with insulated, rigid venting.
(DMH-Pdox) FRAMING AND FINISH FOR NEW BASEMENT 1/2 BATH. FRAME FOR UTILITY ROOM & RELOCATE APPLIANCES. WATER-RESISTANT GYPSUM BACKING BOARD (GREENBOARD) SHALL NOT BE USED OVER VAPOR BARRIERS AT EXTERIOR WALL CONDITIONS OF TUB/SHOWER LOCATIONS. APPR
Adding a basement half bath, Recessed Laundry, Utility Sink and Floor Drain
80% EL280E 70K Lennox Furnace Replace furnace
(DMH - ProjectDox) RECONSTRUCT 12' X 10' WOOD DECK AT REAR SFD WITH NEW JOISTS, BEAMS, POSTS AND 2 DIAMOND PIER FOOTING LOCATIONS. - 2020 IRC. DIAMOND PIERS SHALL BE INSTALL PER MFR INSTALLATION INSTRUCTIONS AND ICC ESR-1895. DECK POSTS SHALL BE CONN
Kitchen and powder room remodel
Install a new 36" entry door to existing framed opening - main level
Modifications to condo unit in existing building including ceilings/lights/soffits, kitchen cabinets, removal of wall -ACW certificate of occupancy required: no special inspections required: no occupancy: R2 2020 MSBC windows w
Reroof rectory and 2 detached garages using asphalt shingles Perform vinyl siding repairs on the right elevation of the rectory
Tear off gable height wood shingles, install vinyl shake style shingles
Tear off existing steel siding and replace with steel siding. Aluminum fascia to be installed not included in steel siding price. No work to be done on detached garage.
REPLACE GAS RANGE
furnace and ac replacement
METER MOVE Q4 - 2024 BATCH #1
METER MOVE Q2 - 2024 BATCH #23
Replacement window main floor bath , Replace 2 cellar/basement windows (No Change in openings ) soffit and fascia front and rear porches on house and garage with aluminum ,wrap exposed window trim on house windows
METER MOVE Q2 - 2024 BATCH #8
METER MOVE Q2 - 2024 BATCH #8
METER MOVE Q2 - 2024 BATCH #8
Replace dishwasher
INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING.(MAA) COLLECTOR CAPACITY _3.44___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1100 Subp.5a as applicable. ADDITIONAL PERMITS: PV SYSTEMS ALSO REQ
Furnace and AC replacement
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.