1. Reinstallation of boiler-run Radiator in the existing bathroom in the basement (upgrading) 2. Install a new vent for heat & cool for the newly installed bathroom upstairs
Electrical work for the following work: 1. Upgrading an existing bathroom in the basement 2. Installing a new bathroom upstairs 3. Installing washer and dryer (gas)
04/10/2026: HOMEOWNER REQUESTED PERMIT CANCELATION AND REFUND. DUPLICATE PERMIT. SEE PERMIT DSIELER-031066-2026 THAT HAS A STATUS OF ISSUED. BM 1. Upgrading an existing bathroom in the basement - reinstalling the existing boiler-run radiation 2. New bathroom upstairs - creating a new vent
This project includes interior framing and drywall work only. In the basement, a new full bathroom area will be framed, along with a separate shower area located outside of the bathroom. Two new closets will also be framed and finished in the basement. On the upper level, a new full bathroom area will be framed and drywalled. No structural changes. Portion of construction will be in the residential area of the mixed use building. Occupancy group is R-3 dwelling unit which is attached to an A-3 religious use.
-Set three shower pans -Perform all required concrete cutting and patch back -Install all new drains, vents, and water lines for both main-floor showers -Rough in and fully finish the upstairs ¾ bathroom (toilet, vanity, and shower)
CHANGE OF OCCUPANCY OF FORMER CHURCH BUILDING FROM EXISTING R3 TO A3 RELIGIOUS INSTITUTION, WORK INCLUDES INSTALLATION OF NEW RESTROOM FACILITIES, MODIFICATION TO EXISTING MECHANICAL/ELECTRICAL SYSTEMS, AND NEW EXIT/ENTRY PATHWAYS. EXISTING ATTACHED DWELLING UNIT IN REAR (R-3 OCCUPANCY) TO REMAIN. THIS PERMIT WILL BE A DUPLICATE, WAS PAID FOR AND ISSUED IN AMANDA BEFORE CYBER ATTACK. ENTERTING PERMIT IN PAULIE SO THERE IS A RECORD TO ATTACH THE NEW BUILDING C OF O TO.
Replace furnace.
CHANGE OF OCCUPANCY OF FORMER CHURCH BUILDING FROM EXISTING R3 TO A3 RELIGIOUS INSTITUTION, WORK INCLUDES INSTALLATION OF NEW RESTROOM FACILITIES, MODIFICATION TO EXISTING MECHANICAL/ELECTRICAL SYSTEMS, AND NEW EXIT/ENTRY PATHWAYS. EXISTING ATTACHED DWELLING UNIT IN REAR (R-3 OCCUPANCY) TO REMAIN.
Re-roof
INTERIOR DEMO OF STAIRS, REPLACE FRONT AND SIDE EXTERIOR DOOR
Replacement of 16 windows