Minneapolis, MN
Minneapolis, MN
9
4
$71,009
INSTALL FALL PROECTION ANCHORS ON ROOF. (JJL) ENGINEER:ENGINEERED DESIGN - ERIC MCELRATH #57207
BLDG1139179 Installing 2 ERV, 4 ductless thought the wall heat pumps. Electric baseboard heaters were installed, by others, that have the capacity to use as primary heat source.
Reroof - PVC General requirements for flat roof replacements. The roof covering is to meet the Minnesota Building code performance requirements of Section 1504, the fire classification of Section 1505 and the material requirements as specified in sect
REMODEL STOREFRONT, NO ALTERATION TO EGRESS 2020 MSBC
The scope of this project includes: install new waste, vent, and water for toilet, lav, hand sink, 3 compartment sink with drain, mop sink, and 2 floor drains. All plumbing shall be installed in accordance with the 2020 Minnesota State Plumbing Cod
HVAC system, installing split system with Dx coil and heat pump condensing unit, energy recovery unit, exhaust fan, GRDs and all associated ductwork per approvedplans.
Tenant Improvement - North Half of 1st floor - New Coffee Shop certificate of occupancy required: yes special inspections required: no const type: IIB occupancy: B 2020 MSBC occupant load: 47 sprinklered: no 20% ac
Toilet, lav, 3 sinks, water heater
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.