Minneapolis, MN
Minneapolis, MN
61
2
$545,260
1
Tear off and reroof house.
METER MOVE Q4 - 2021 BATCH #3
METER MOVE Q4 - 2021 BATCH #3
METER MOVE Q4 - 2021 BATCH #3
METER MOVE Q4 - 2021 BATCH #3
METER MOVE Q4 - 2021 BATCH #3
(DMH - ProjectDox) RECONSTRUCT 8 X 8 TREATED WOOD DECK AT REAR SFD WITH 2 X10 JOISTS, (3) 2X 10 BEAMS, GUARDRAIL, TREATED WOOD POSTS AND 2 "DIAMOND PIER" FOOTING LOCATIONS. IN LIEU OF "DIAMOND PIERS" PROVIDE 12" X48" CONCRETE FOOTINGS. THE 2020 IRC H
Replace furnace and central AC with new Daikin DM96VE060 and DX16SA018 respectively
Hpt water piping and vent bath fan
REMODEL MAIN FLOOR BATH. REPLACE BATHROOM WINDOW WITH GLASS BLOCK. REMOVE STAIRS AND FILL IN WTH 2X10 JOISTS. EXISTING PLAN HAS (2) SETS OF STAIRS GOING TO LEVEL 2, NOW WILL ONLY HAVE ONE. 2ND FLOOR BATHROOM TO BE REMODELED. PATCH EXTERIOR STUCCO NE
Re-roof
INSTALL NEW DAIKIN DUCTLESS AIR CONDITIONER
CONSTRUCT DETACHED __16_ BY _20__ WOOD FRAME GARAGE. GARAGE RETAINING WALL CONDITIONS: YES / NO Construction Documents: ELECTRONIC (ProjectDox) Building Code: 2020 MN RESIDENTIAL CODE/MN RULES CH 1309 (2018 IRC) Energy Code: 2015 MN RESIDENTIAL ENERG
(DMH - ProjectDox) REPLACE AND INSTALL NEW BASEMENT STEEL BEAMS, STEEL POSTS AND PAD FOOTINGS PER ENGINEERED PLANS FROM PAUL VOIGHT,#20705 IN SFD. STEEL ADJUSTABLE POSTS SHALL BE MADE PERMENANTLY NON-ADJUSTABLE AFTER PLACEMENT. IF REQUIRED BY BUI
Kitchen remodel with new sink and dishwasher Move existing gas range to new location
Replace Gas Range
MOVE METER - Q3 2019 BATCH #6
5 window replacements in existing openings.
REPLACE GAS DRYER, GAS LINE & BRING TO CODE
Install one electric water heater
Replacing 7 windows in existing openings.
2 furnaces replaced at duplex, one for 3149 and one for 3151 60k btu each side
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.