Minneapolis, MN
Minneapolis, MN
49
10
$3,029,290
Ventilation work and equipment only, piping and piping equipment by others.
furnace replacement
RENOVATION OF EXISTING BUILDING (SABATHANI COMMUNITY CENTER) NEW GEOTHERMAL SYSTEM, NEW MECHANICAL, STRUCTURAL WORK, DOORS. NO CHANGE TO EXITING. NEW 1 HOUR SHAFT. (JJL) certificate of occupancy required: no special inspections required: y
Install 6 new supply's and 4 new returns for basement, install mail level bath fan and basement bath fan both gbr80 delta fans.
WHOLE HOUSE INTERIOR REMODEL. REMOVE WALL AND REPLACE W/ BEAM. FINISH BASEMENT. (JJL) ENGINEER: PRIEVE ENGINEERING - NATHAN PRIEVE #46203 Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE R
REMOVE AND REPLACE CONCRETE LANDING (2 NEW 8" PIER FOOTINGS) AND STEPS (3 RISERS, 12" TREADS) AT FRONT DOOR OF SFD. Building Code: 2020 MN RESIDENTIAL CODE/MN RULES CH 1309 (2018 IRC) Energy Code: 2015 MN RESIDENTIAL ENERGY CODE/MN RULES CH 1322 Co
sabathani community center run gas line from roof
We are venting a water heater to the Community center so that they are able to use it for training/ teaching purposes. We are not running a waterline to it. HVAC side will be installing a gas line to the water heater.
Replace furnace and ac Lennox SL280UH070V36A Furnace Lennox ML14KC1-024 Air Conditioner
Remove existing siding and replace with vinyl siding, aluminum wrap windows
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.