Rochester, MN
Rochester, MN
Rochester, MN
3050 NW SUPERIOR DR, Rochester
ROSU23C0030 - Upgrading and reconfiguring mechanical, electrical, and plumbing systems. Modifications to roof and structural steel to support the new HVAC equipment installations. Installing new hollow metal door frames as needed. Updating/repairing finishes such as ACT, flooring, painting, and casework.
3050 NW SUPERIOR DR, Rochester
New fan coil unit
3050 NW SUPERIOR DR, Rochester
Mechanical work associated with installing the Cooling Fan Coil and the Exhaust Fan to mitigate the heat produced by extra equipment in the space. Mayo #77616 Harris #Y080096094
3050 NW SUPERIOR DR, Rochester
Emergency Boiler
3050 NW SUPERIOR DR, Rochester
Gas piping to a temp boiler
3050 NW SUPERIOR DR, Rochester
New Chilled Water FCU's to install
3050 NW SUPERIOR DR, Rochester
ROXX22C0370 - Build duct bank from the existing S&C switches Infront of the Marvin building to the SDSC building. there will be 3 manholes and a vault for 2 new S&C switches. 2 new S&C switches will be installed on the SDSC property. Foster Job# 224053
3050 NW SUPERIOR DR, Rochester
Underground piping, RP install
3050 NW SUPERIOR DR, Rochester
Mechanical work related to the installation of a cooler dehumidifier and the associated ductwork. Mayo #25172 Harris #Y080018436-N5080
3050 NW SUPERIOR DR, Rochester
Temperature Controls ROSU23C0010
3050 NW SUPERIOR DR, Rochester
Temperature Controls - ROSU21C0010
3050 NW SUPERIOR DR, Rochester
Renovation of infectious handling space. adding (2) sterilizers and backflow protection
3050 NW SUPERIOR DR, Rochester
FURNISH AND INSTALL DUCTWORK, FANS, GRD, AND HEPA FILTER HOUSING
3050 NW SUPERIOR DR, Rochester
Upgrade infectious room to include new lighting, wire mold and panelboard. Foster job # 224041
3050 NW SUPERIOR DR, Rochester
Mechanical HVAC work for converting office space to a wet lab space at the Superior Drive Support Center for Mayo Clinic.
3050 NW SUPERIOR DR, Rochester
Mayo - Superior Drive Support Center - 1st Level - Electrical work to convert office space to wet lab space - Mayo Project ROSU21C0010 Adair Job 17263
3050 NW SUPERIOR DR, Rochester
ROSU23C0010 Lab Renovation
3050 NW SUPERIOR DR, Rochester
SDSC -Remodel office to wet lab
3050 NW SUPERIOR DR, Rochester
SDSC-Remodel office to wet lab
3050 NW SUPERIOR DR, Rochester
James Kelly/ROSU21C0010/SU Convert Office Space to Wet Lab Space SU1010, SU 1001-2/Expansion of CMSL and CFTL labs from office space previously occupied by staff being relocated to remodeled areas in Phase 2 DLMP Master Plan. A plan to address control areas for flammable liquids that are at capacity must be identified as a part of the project to allow for the continued expansion of labs on the 1st level of SDSC.
3050 NW SUPERIOR DR, Rochester
New water softener at sdsc, ne clinic, tech drive warehouse
3050 NW SUPERIOR DR, Rochester
Mayo - Superior Drive Support Center - 01-210 - Electrical work for SU-1-210 remodel - Mayo WO 0060243 Adair WO W6248 - This work is T&M
3050 NW SUPERIOR DR, Rochester
Mechanical work associated with duct revisions for new HTM work space. Mayo #60243 Harris #Y08001818262-N5080
3050 NW SUPERIOR DR, Rochester
M0047474 New Consultant Offices/ Hillary Hughes
3050 NW SUPERIOR DR, Rochester
HVAC rework associated with office remodel including Vav's with reheats and ductwork. Mayo# 47474 Harris Job# Y080018204-N5080
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.