Plumbing work related to the relocation of the existing sink. Mayo # ROSU23C0030 - SDSC Support Space Optimization Harris Job #0800452-N5080
Gas piping work associated with the installation of natural gas lines for a new MAU. Mayo # ROSU23C0030 SDSC Support Space Optimization Harris Job# 0800452-N5080
ROSU23C0030 - Upgrading and reconfiguring mechanical, electrical, and plumbing systems. Modifications to roof and structural steel to support the new HVAC equipment installations. Installing new hollow metal door frames as needed. Updating/repairing finishes such as ACT, flooring, painting, and casework.
New fan coil unit
Install an outlet on the closest 24hr power CCT.
Mechanical work associated with installing the Cooling Fan Coil and the Exhaust Fan to mitigate the heat produced by extra equipment in the space. Mayo #77616 Harris #Y080096094
Emergency Boiler
Gas piping to a temp boiler
New Chilled Water FCU's to install
ROXX22C0370 - Build duct bank from the existing S&C switches Infront of the Marvin building to the SDSC building. there will be 3 manholes and a vault for 2 new S&C switches. 2 new S&C switches will be installed on the SDSC property. Foster Job# 224053
Underground piping, RP install
Bay ID: Quad needs to be installed in center area behind bay 10-006 Scope: Rogers will need to install a quad in the bay(s) listed above. Quad needs to be mounted on the back upright of the bay 8’ AFF and must be attached using toggle bolts.
Mechanical work related to the installation of a cooler dehumidifier and the associated ductwork. Mayo #25172 Harris #Y080018436-N5080
Bay ID: 13-009, 13-011, 13-013, 17-016 - Refer to the bay ID's above. We will need to disconnect and remove the lights, whips, or other electrical from these bays. Once removed, please place in electrical room with shrink wrap and mark HOLD FOR ROGERS ELECTRIC. We will return on a separate WO to reconnect if requested. - *****, DO NOT remove any lighting or fan displays*****
Temperature Controls ROSU23C0010
Temperature Controls - ROSU21C0010
Renovation of infectious handling space. adding (2) sterilizers and backflow protection
FURNISH AND INSTALL DUCTWORK, FANS, GRD, AND HEPA FILTER HOUSING
Upgrade infectious room to include new lighting, wire mold and panelboard. Foster job # 224041
Mechanical HVAC work for converting office space to a wet lab space at the Superior Drive Support Center for Mayo Clinic.
Mayo - Superior Drive Support Center - 1st Level - Electrical work to convert office space to wet lab space - Mayo Project ROSU21C0010 Adair Job 17263
ROSU23C0010 Lab Renovation
SDSC -Remodel office to wet lab
SDSC-Remodel office to wet lab
James Kelly/ROSU21C0010/SU Convert Office Space to Wet Lab Space SU1010, SU 1001-2/Expansion of CMSL and CFTL labs from office space previously occupied by staff being relocated to remodeled areas in Phase 2 DLMP Master Plan. A plan to address control areas for flammable liquids that are at capacity must be identified as a part of the project to allow for the continued expansion of labs on the 1st level of SDSC.