$179,809
Replace 15 rooftop units like for like
New sink
Electrical work for Mayo# ROSU24C0010 - Roof Top HVAC Unit Replacement Egan Foreman: Dave Staloch 507-273-3997 Egan Job# 614041-910
Natural Gas Piping for RTU Replacement at SDSC - Mayo Project #ROSU24C0010 / #25613
Hydronic Work for SDSC RTU Replacement - Mayo Project #ROSU24C0010 / #25613
Mayo-Superior Drive Support Center-02 -Electrical work to install Roche Cobos & Millipore CLRW -Mayo work order number 0085279 Adair work order number WA1245 -This work is T&M
TEMPERATURE CONTROLS ROSU24C0010
ROSU24C0010 - Roof Top HVAC Unit Replacement
Install floor sink
Gas piping to replacement boilers
Boiler replacement
TEMPERATURE CONTROLS ROSU25C0010
Mayo-Superior Drive Support Center-01 Floor -Electrical work for Remodeling & Expansion Prep and Process Lab SDSC -Mayo project number ROXX23C0450 Adair project number 18001
Mechanical work related to installing a new boiler flue and venting to two (2) replacement boilers. Mayo ROSU25C0010 - SDSC Boiler Replacement Harris Job # 0800467001-N5080
Temperature Controls ROXX23C0450
Temperature Controls ROSU23C0030
Install New Fan Coil Unit Mayo #94943 - Superior Drive Support Center Penthouse-3000 Harris #Y080096438-N5080
Mayo-Superior Drive Support Center -Electrical work for install of 2 new fulton boilers -Mayo project number ROSU25C0010 Adair project number 18029 -This work is T&M
Aisle 01: ALL BAYS Aisle 45: bay EC1 Aisle 48: bays 09 11 Aisle 49: bays 01 02 03 04 05 06 07 08 09 10 11 13 15 17 19 Aisle 50: bays 01 02 03 04 05 07 09 14 16 18 19 20 EC1 EC2 Aisle 51: ALL BAYS Aisle 52: bays EC2 Reconnect power for lighting displays. All lighting displays in aisles 48 49 50 51 will need to connect the displays in each bay. All lighting displays will need to be connected to power, including chandeliers, lightbulbs and lighting displays. Reconnect power to bulb displays in aisle 49.
ROXX23C0450 - Three phase remodel of an existing workroom, storage, and lab being converted into a larger laboratory space with a storage room.
Mechanical work related to the renovation of existing HVAC systems. Mayo # ROXX23C0450 - Remodel & Expansion Prep-Process Lab SDSC Harris Job #0800471-N5080
Plumbing alterations for lab remodel Mayo SDSC-Prep and Process Lab-Project #ROXX23C0450
Humidifier for Updated Lab Space Mayo SDSC Building-Prep and Process Lab-Project #ROXX23C0450
update fire alarm devices and and replace roof top unit to include new VFD'S Foster Job# 225028
Mechanical work related to the installation of new MAU and 2 PRV Exhaust Fans. Installation of new exhaust ductwork. Mayo # ROSU23C0030 - SDSC Support Space Optimization Harris Job #0800452-N5080