Rochester, MN
Rochester, MN
175
8
$51,058,047
ANNUAL PLUMBING PERMIT FOR KELLEN BUILDING MAYO MAINTENANCE
VERIFY ATMOSPHERIC WATER HEATER WAS INSTALLED PER CODE. MAKE ANY CORRECTIONS NECESSARY
REPLACE AC
Replace ac
Installing new AC
electrical for ac reset
Temperature controls ROKB24C0010
ROKB24C0010 - Fit-Up of the 9th Floor of the Kellen Research Building.
Plumbing Work for Kellen 9 Lab refit. ROKB24C0010
Hydronic Work for the Kellen 09 Lab Fit Up. ROKB24C0010
Gas piping work for the Kellen 09 Lab Fit Up. ROKB24C0010
Mechanical HVAC work for Kellen 09 Lab Fit Up. ROKB24C0010
Buildout of the 9th floor which is currently a shelled space, new lighting, lighting controls, panelboards, outlets, fume hoods vav's and cable tray. Foster Job# 225005
New RP for a backup chiller unit
Add 100 amp, 480 volt disconnect for permanent temporary power in Kellen building. Subway level, room 108.
ANNUAL PLUMBING PERMIT FOR KELLEN BUILDING MAYO MAINTENANCE
New RP
ANNUAL PLUMBING PERMIT FOR KELLEN BUILDING MAYO MAINTENANCE
24-6518. Replacement of Air Conditioning equipment for home.
New sump pump circuit
Adding a VFD for an exhaust fan
Gas Piping for equipment
Electrical duct banks that extend off the existing Bus 10/11 ductbanks from mid-block on 3rd Street SW between 4th Ave SW and 5th Ave SW. These extend West along 3rd Street SW to 6th Ave SW and Head North on 6th Ave SW to the South side of 2nd Street SW
Remove and replace 1 window same size no structural change | Other
Chilled Beam, VAV
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.