Re vent the water heater and bring up to code/tish standards. Did not replace or repair water heater, just re vented water heater.
FOUNDATION REPAIR ******************************************************************************** ******************************************************************************** ENGINEER SITE INSPECTIONS AND SUBMITTAL The Engineer of Record is to
Once joist and house supported, will demo 15 or more of concrete to gain access to excavate and remove debris, then pour new footing 8 x 20 x 15 then rebuild wall with 12 cmu wall 15 x 7 with return into original wall, then will connect to bottom p
Wall rebuild Once joist and house supported, will demo 15 or more of concrete to gain access to excavate and remove debris, then pour new footing 8 x 20 x 15 then rebuild wall with 12 cmu wall 15 x 7 with return into original wall, (subject to city
METER MOVE Q1 - 2025 BATCH #16