Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
10 26TH ST E #300, Minneapolis
A/c add on Split system central.
4300 46TH AVE S, Minneapolis
WATER HEATER
300 6TH ST S, Minneapolis
GRD & duct as shown on plan
2300 26TH ST E, Minneapolis
REPLACE EXISTING AHU WITH ADDISON PACKAGED RTU / NO PLANS / LIKE FOR LIKE CHANGE OUT
300 6TH ST S, Minneapolis
office remodelfor elections offices on 1st floor. sck
4300 46TH AVE S, Minneapolis
REPLACE GARAGE DOOR
300 6TH ST S, Minneapolis
Adding a secure ceiling and some misc HVAC work in the Sherrifs office tunnel. mech plans provided. mechanical plans required for certificate of occupancy mechanical plans/letter of means of compliance submitted\ special inspections required no
300 6TH ST S, Minneapolis
FLOOR A17-REMODEL certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2015 MSBC occupant load: 282 sprinklered: yes Tenant: Hennepin County District Court IT Floor: A1
3000 26TH ST E, Minneapolis
Replace gas stove
300 6TH ST S, Minneapolis
17TH FLOOR/ADMINISTRATION TOWER - REMODEL - replace (2) 500cfm VAV's - replace (3) GRD's with new
300 6TH ST S, Minneapolis
adding sink and lav to mothers room on A17 floor
300 6TH ST S, Minneapolis
TEMPORARILY CAP SANITARY WASTE CAP WITH CONCRETE UNTIL SPRING FOR PROPER CAPPING AT WATER MAIN.
300 6TH ST S, Minneapolis
FOR ADMINISTRATION TOWER PUBLIC RESTROOMS AT SKYWAY LEVEL: INSTALL 3 URINALS , 6 LAVATORIES, AND 9 TOILETS
300 6TH ST S, Minneapolis
REMODEL SKYWAY LEVEL PUBLIC RESTROOMS WITH NEW PARTITIONS AND FINISHES (JAG) certificate of occupancy required: no const type: I-A (ASSUMED) occupancy: B 2015 MSBC occupant load: NA sprinklered: yes energy code chapter used: 2015 M
300 6TH ST S, Minneapolis
Replace linear diffusers with lay-in diffusers - C-5 Signing Judge
300 6TH ST S, Minneapolis
Communication office - VAV & Relocate diffusers
300 6TH ST S, Minneapolis
SINK-OTHER - BREAKROOM SINK
300 6TH ST S, Minneapolis
ADMIN TOWER 4TH FLOOR - TWO VAV BOXES (4"/0-225)
300 6TH ST S, Minneapolis
install breakroom sink - A494, 4th floor
300 6TH ST S, Minneapolis
DUCTS & DIFFUSERS ONLY / HOOK UP TO EXISTING
300 6TH ST S, Minneapolis
INSTALL ADDITIONAL 3 LAYERS OF DRYWALL AT 'C' TOWER, SKYWAY LEVEL, TO BUILD OUT FOR NEW GRAPHICS WALL. (DMH#2) ARCHITECT: PAUL GATES, #40330 APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. IT IS THE RESPONSIBILI
300 6TH ST S, Minneapolis
Remodel for new signing judges space certificate of occupancy required NO special inspections required NO const type: I-A occupancy: B 2015 MSBC sprinklered: YES Tenant: Floor(s): 5 sac: __charges __credits = __ net met cou
300 6TH ST S, Minneapolis
12th floor c tower sink for mother room
300 6TH ST S, Minneapolis
Remodel approx. 5,000 s.f. office space certificate of occupancy required NO special inspections required YES - FIRE RATED PENETRATIONS PER 1705.16 const type: II-B occupancy: B 2015 MSBC occupant load: 246 sprinklered: YES T
300 6TH ST S, Minneapolis
replace revolving doors to north and south terraces on skyway level. replace doors in north tunnel to city hall. sck#2 engineer: sarbaugh
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.