Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
1300 6TH ST NE, Minneapolis
New laundry sink and 2nd floor toilet.
300 6TH ST S, Minneapolis
REPLACE EXISTING EXHAUST FAN / DUCTS / GRD'S FOR RESTROOM RENOVATION PROJECT
300 6TH ST S #HENN CTY G, Minneapolis
REMODEL OF A-LEVEL RESTROOMS
300 6TH ST S, Minneapolis
300 6TH ST S, Minneapolis
remodeling and alterations on all levels related to elevator upgrades and escalator replacements. sck**************certificate of occupancy required: yes no ********** const type: 1a occupancy: b 2015 MSBC************** sprinkl
300 6TH ST S, Minneapolis
DEMO / INSTALL 24 NEW GRD'S & DUCTS FOR 2ND FLOOR ELECTIONS OFFICE
300 6TH ST S, Minneapolis
Tenant remodeling for Elections location certificate of occupancy required: NO ********** special inspections required: NO********** Tenant: HCGC Floor(s): ************ sac: __charges __credits = __ net*********** met council letter dated _NA
300 6TH ST SE, Minneapolis
REPLACE WATER HEATER
3009 6TH ST N, Minneapolis
Remove and replace 9 windows, same size, no structural changes.
300 6TH ST S, Minneapolis
remodel locker and restrooms level #b
300 6TH ST S, Minneapolis
remodel existing B-level bathroom/locker rooms. sck#1 certificate of occupancy required: no special inspections required: no const type: 1a occupancy: b 2015 MSBC sprinklered: yes architect: mcnamara
2300 26TH ST E, Minneapolis
contact is Craig Giebel 763-544-5100 The permit is for installing vent pipe on new replacement printing press. I advised Craig to provide piping and printing press specification to inspector when meeting for inspection. No drawing submitted for this app
300 6TH ST S, Minneapolis
stabilazation anchors AT GOVERNMENT CENTER (JAG)*** INTERMEDIATE STABILIZATION ANCHORS ON EXTERIOR FACE FOR EXISTING ROOF ANCHORS PER ENGINEERED DESIGN.*** SPECIAL INSPECTIONS: (AS DETERMINED BY ENGINEER OF RECORD PER CODE) THE STRUCTURAL ENGINEER OF
300 6TH ST S, Minneapolis
REROUTE DUCTS & GRD'S PER PLANS ON SKYWAY LEVEL A TOWER
300 6TH ST S, Minneapolis
SINK/PUMP
300 6TH ST S, Minneapolis
(DMH#1) DEMO AND REMODEL TO EXISTING 4,122 SQ.FT. OFFICE SPACE, SKYWAY LEVEL OF H.C. GOVMT BLDG TOWER 'A'. NO CHANGE IN USE OR EXITING. M/E/P PLANS INCLUDEDED. Const type: 1-A Occupancy: B 2015 MSBC occupant load: 49 (Archit calc.)
300 6TH ST S, Minneapolis
20 FIXTURES
300 6TH ST S, Minneapolis
remodel level A court security locker rooms. sck#1 certificate of occupancy required: no const type: 1a occupancy: b 2015 MSBC sprinklered: yes 20% accessibility upgrades___all new toilet rooms and showers_______ architect:
300 6TH ST S, Minneapolis
A-LEVEL COURT SECURITY LOCKER ROOMS-HVAC MODIFACATIONS PER ENGINEERED DRAWINGS TO INCLUDE: ROUTE NEW DUCTWORK TO EXISTING OPENINGS, NEW VAV's & FPVAV's, REROUTE EXHAUST DUCT AND FIN TUBE RADIATION
300 6TH ST S #RAMP, Minneapolis
300 6TH ST S #RAMP, Minneapolis
FLOOR DRAINS AND RECONNECT PIPING
300 6TH ST S, Minneapolis
Connecting new 18" chilled water line from 18" NRG energy center line to the existing Government Center chilled water feed as a backup.
300 6TH ST S #RAMP, Minneapolis
parking garage repair. MEYER BORGMAN JOHNSON ENGINEER: ROSS TURNER #19970
300 6TH ST S, Minneapolis
EXTEND DOMESTIC WATER BY 40 FEET
300 6TH ST S, Minneapolis
FOR 1ST FLOOR/ELECTIONS RELOCATION PROJECT - INSTALL DOUBLE COMPARTMENT SINK WITH SANITARY WASTE AND VENT MODIFICATIONS
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.