Shakopee, MN
Shakopee, MN
22
6
$1,181,231
TI Buildout of partial 1st floor space
Tennant improvements
Tenant finish of 1st floor vanilla shell space
Plumbing addition, sink and water heater.
Install a wall sign
New fire sprinkler backflow device
Installing cabinet and Flat cut out letters to monument sign
Plumbing installation for restroom, breakroom, and water station.
Edward Jones Tenant Modifications
New construction. Edward Jones (tenant)
Installation of new underground electric for High Stakes Venture Shell
Comcast Underground Fiber Installation - Job # JB0002163240: Pulling fiber through existing Comcast conduit. Directional boring for placement of (2) 2" HDPE conduits.
1 Wall Sign on West elevation.
3 Wall signs - LED Illuminated Channel Letters on South, East and North sides. All signs are the same size for each elevation.
Wire new building Shell. New Service, Lighting, Panels
2nd Floor tenant improvement for Danny's Construction in the High Stakes Venture building which is currently under construction
Dannys TI Buildout of Second Floor
New Sprinkler System throughout
Install new fire alarm system: 1 FACP, 1 cell dialer, 1 pull station,4 smoke detectors, 5 addressable modules, 5 horn strobes, 2 strobe only
Plumbing system for tenant build out of Dannys Construction.
Install new fire alarm system: 1 FACP, 1 cell dialer, 1 pull station,4 smoke detectors, 5 addressable modules, 5 horn strobes, 2 strobe only
gas piping to equipment provided by allan mechanical
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.