Minneapolis, MN
Minneapolis, MN
56
4
$19,000
Parking ramp expansion elevator lobby & elevator machine room HVAC per engineered drawing to include RTU @ 36kw heat/94,700btuh cooling, split A/C W/ AHU @24,700btuh exhaust fan @ 450 cfm
FURNISH/INSTALL SUMP PUMPS WASTE TRAPS CHECKTRAPS STROM WATER DRAINS AND ALL REQUIRED PIPING
VRF SYSTEM - COOLING ONLY & REPLACE EXHAUST FANS PER ENGINEERED DRAWINGS
EXTERIOR CLADDING AND WINDOW REPLACEMENT (MAA#02) REVISION: CAHNGE IN LAYOUT AND CONFIGURATION OF STUCCO AND METAL PANELS. AS PER ENGR. OF RECORD KEN JONE: Here are the two types of metal panels we plan on using for the façade. There is n
DEMO EXTERIOR FACADE
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.