Minneapolis, MN
Minneapolis, MN
56
4
$19,000
1
Replace (4) garage floor drains with associated piping to ground cleanout tees.
per john seaberg. ground work drain line repairs
run 2 gas lines to 2 fireplaces and vent
replace 3 timber window wells. not egress.
REBUILD STAIRS ON HELICAL PIERS (MAA) ENGR: JESSE DEAN 58974
Complete installation of 199K BTUH boiler.
Replace dishwasher
CODE COMPLIANCE REHAB PLUS BASEMENT FINISH, MAIN FLOOR REMODEL, WINDOW REPLACEMENTS AT 1-STORY SFD. CODE COMPLIANCE REPAIRS AT SFD AND ATTACHED GARAGE DUE TO WATER DAMAGE PER CODE COMPLIANCE ORDERS PLAN12274 DATED 03/10/2021. MOLD REMEDIATION THROUGHOU
REPLACE ONE GAS WATER HEATER
HVAC REHAB FOR VACANT HOUSE - 60000 BTU FURNACE, 2.5 TON A/C, DUCTWORK, KITCHEN HOOD, 3 BATH FANS AND GAS PIPING FROM GAS MAIN
Removal and replacement of existing boiler. New boiler 210KBTUH.
PLUMBING FIXTURES FOR BATHROOM REMODELING - Demo existing tub/tub valve. Install New shower base with surround. Hook shower drain into existing drain. Install new Shower posi temp valve.
REPLACEMENT THREE (3) EXISTING VERIZON WIRELESS TELECOMMUNICATIONS ANTENNAS (EQUIPMENT) WITH SAME SIZE OR SMALLER. AAJ (PROJECT DOX PLANS AND DOCUMENTS). - SWAP EXISTING THREE (3) ANTEENAS WITH ANTENNAS OF SAME OR SMALLER PER STRUCTURAL ENGINEER'S D
bathroom remodel in unit 208. sck
REMOVE AND REPLACE TUB TOILET AND SINK
bathroom remodel in unit 203. sck
NON-STRUCTURAL BATHROOM REMODEL INCLUDING REMOVAL OF EXISTING FINISHES. (sza) INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR WALL CONDITIONS. NO WINDOW REPLACEMENT REPLACE FIXTURES WITH NEW. CEMENT, FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS SHALL BE U
FOR BATHROOM - DEMO EXISTING TUB. INSTALL NEW SHOWER BASE AND SURROUND. ADD NEW POSITEMP VALVE
modifications to existing rooftop telecommunications equipment. sck****
range and dishwasher
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.