Rochester, MN
Rochester, MN
71
3
$7,400
1
Replace water heater.
Plumbing work to include a multipurpose sprinkler system for a new townhome with unfinished basement, 12 x 12 treated deck, gas fireplace in living room and attached two-car garage Hawk Ridge Model #29-2
Gas piping for new townhome dwelling with unfinished basement, 12 x 12 treated deck, gas fireplace in living room and attached two-car garage Hawk Ridge Model #29-2
Kozy Heat fireplace at the main floor living room. Twinhome dwelling with unfinished basement, 12 x 12 treated deck, gas fireplace in living room and attached two-car garage Hawk Ridge Model #29-2
Plumbing (UNDERGROUND ONLY) - Twinhome dwelling with unfinished basement, 12 x 12 treated deck, gas fireplace in living room and attached two-car garage Hawk Ridge Model #29-2
Installation of an RPZ (The Hylands)
Mechanical work for new Townhome with unfinished basement, 12 x 12 treated deck, gas fireplace in living room and attached two-car garage Hawk Ridge Model #29-2 Mechanical work includes the lower level.
Electrical work for new townhome dwelling with unfinished basement, 12 x 12 treated deck, gas fireplace in living room and attached two-car garage Hawk Ridge Model #29-2
Twinhome dwelling with unfinished basement, 12 x 12 treated deck, gas fireplace in living room and attached two-car garage Hawk Ridge Model #29-2
Three bedroom window replacements in existing openings | Other
16 X 16 Storage addition to detached garage | Other
Water heater replacement (GrandeVille at Cascade Lake) Unit 2712
Mechanical - furnace replacement
Mechanical - furnace replacement THE HYLANDS
Electrical (adding new 20A circuit - seven (7) outlets/relocating lights in laundry/storage area and adding new switches/adding lights in family room to total six (6) where two (2) currently exist/ (two) 2 shop lights) - Lower Level - framing energy walls along stairs, under stairs and into Utility Room - walls be insulated/vapor barrier/sheetrocked.
Plumbing (relocating hot/cold water lines existing upstairs to new tub sink in basement/ tub sink 1 1/2" drain 42" from existing drain with existing vent) - Lower Level - framing energy walls along stairs, under stairs and into Utility Room - walls be insulated/vapor barrier/sheetrocked.
Mechanical - furnace and air conditioner replacement
Lower Level - framing energy walls along stairs, under stairs and into Utility Room - walls be insulated/vapor barrier/sheetrocked. | Basement Finish
Plumbing - water heater replacement
Mechanical - furnace and a/c replacement
New landscaping/Modular Block Wall (retaining wall)
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.