Minneapolis, MN
Minneapolis, MN
77
8
$14,980,291
STE 175 HEMATOLOGY ONCOLOGY CONVERT OFFICE INTO EXAM ROOM certificate of occupancy required: no const type: 1-A occupancy: I-2 2020 MSBC The building inspector will require a passing report of fire stopping at all new or modi
HVAC alteration per attached plans.
FIXTURES FOR BASEMENT LVL & 2ND FLR LAB - ENDOSCOPY PROCESSING
8th Floor Children's epilepsy management unit (EMU). Installing one cooling only VAV, one VAV with Reheat, clothes dryer vent. GRDs and all associated ductwork. Refer to attached drawings.
8th Floor Children's epilepsy management unit (EMU). Add (1) Intregal Bowl Sink with Deck mounted faucet and (1) clothes washing machine. See attached drawings for additional information and details
8th floor Remodel (Epilepsy Monitoring Unit) nurses station and family lounge The building inspector must approve the restoration of fire and acoustical assemblies disrupted by the work before concealment certificate of occupancy required: no
REMOVE AND REPLACE MRI CHILLER and diffusers
renovate MRI suite including replacing the RF shielding envelope certificate of occupancy required: no special inspections required: yes The building inspector may require special inspections to approve the restoration of fire rated assemblies
security operations center remodel certificate of occupancy required: no const type: 1-A occupancy: I-2 2020 MSBC occupant load: no change sprinklered: yes architect: E Young #59120
Plans attached. 1st floor security command center.
Add staff toilet room to level 3. Scope of work clouded on construction documents, remaining scope already permitted under BLDG925162
1st floor radiology waiting remodel certificate of occupancy required: no special inspections required: no const type: 1A occupancy: I-2 2020 MSBC sprinklered: yes sac: not necessary met council letter dated 11-3-22 ar
FOR 1ST FLOOR - Add plumbing for new sink and coffee maker.
GRD replacement and return air booster fan for waiting room. Minor remolding of level 1 and basement for radiology.
Engineered system. refer to attached drawings.
REMODEL TREATMENT ROOMS certificate of occupancy required no special inspections required no const type: 1-A occupancy: I-2 2020 MSBC occupant load: no change sprinklered: yes architect: HDR; Emerson #56621
R and R GRDS for 3 existing patient rooms. Plans attached.
Installation of new anti ligature fixtures
Installing new Siemens provided chiller with air cooled condenser and associated chilled water piping to support computerized tomography scanner.
1ST FLOOR - CT IMAGING SPACE UPDATE certificate of occupancy required no special inspections required no const type: 1-A occupancy: I-2 2020 MSBC occupant load: no change sprinklered: yes sac: __NA architect: HDR; Mol
HVAC system upgrade, demolishing existing piping, duct work and associated, installing VAV boxes with hot water reheat coil, exhaust fans, finned tube radiation, piping, GRDs and all associated ductwork. Refer to attached drawings.
REMODEL AN AREA ON LEVEL ONE - NEW LIMITED STAY UNIT. certificate of occupancy required no special inspections is required - fire proofing patch and Firestop per 1705.17 const type: 1-A occupancy: I-2 Health Care 2020 MSBC and NF
Remodel of Limited Stay Wing, new plumbing and medical gas replacement throughout.
HVAC system renovation of new MRI suite, adding 24 tons air cooled chiller, VAV boxes, electric humidifiers, reheat coil, low pressure steam and hydronic piping, GRD's and all associated ductwork. Refer to attached drawings.
LOCATION: LEVEL 1,2, AND 3/AREAS A, B, AND C. RENOVATIONS FOR NEW IMRI SUITE DEMO EXISTING DOMESTIC HOT AND COLD WATER, WASTE AND VENT PIPING AND EXISTING FIXTURES PROVIDE AND INSTALL NEW DOMESTIC HOT & COLD WATER, WASTE AND VENT, NON-POTABLE COLD
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.