Saint Paul, MN
Saint Paul, MN
12
3
$110,000
Plumbing — Detailed Scope of Work Revision with 3rd level roughing in only. Also stated below in areas revolving around 3rd level work. Assumptions Minnesota Plumbing Code; inspections by City of St. Paul. Domestic water: PEX-A home-run manifold (red/blue) sized per code with pressure-balanced branches; copper stubs at exposed fixture drops where desired. Drainage: PVC DWV (3” mains, 2” typical branches) with cleanouts at base of stacks and at 100-ft intervals; grade 1/4” per foot unless design requires 1/8”. Final fixture count per approved plans; routing coordinated with dropped ceilings on 1st-floor north unit. Domestic Hot Water (3 Water Heaters) (3) new water heaters sized per unit/stack loads. Base scope assumes 50-gal, power-vent, 40–50k BTU gas each, FVIR compliant, or direct-vent if required by combustion-air limitations. 2Pan and drain (where above finished areas), expansion tank, vacuum relief, seismic strapping if required. PVC/CPVC/PP venting to exterior; condens
Warm air for entire building, two new furnaces one for 2nd floor and one for rough in on third floor. Keeping existing furnace in basement but moving to a new location. Duct work that is existing will be rerouted. new duct work will be added to everything in the home.
Full House remodel, New service
HPC - REMOVE AND REPLACE 20 WINDOWS SAME SIZE NO STRUCTURAL CHANGE.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.