$84,998,658
HVAC system for 10th floor, adding fan-powered and VAV boxes, fin tube radiation,GRD's and all associated ductwork. Refer to attached drawings.
(DMH - ProjectDox) 10TH FLOOR OFFICE TENANT BUILD-OUT TO 18,079 SQ,FT. FOR RECEPTION, MULITPLE SMALL OFFICES, OPEN OFFICE, SMALL CONFERENCE ROOMS AND EMPLOYEE KITCHEN SPACE. 11/17/21- Revised plans (Arch Bulletin#1) submitted with minor changes to Archi
construct multi-tenant office corridor on 7th floor. sck
Installing 4 type I hoods. Will mechanically fasten hoods and doesn't include any duct work or fire suppression system. Refer to attached drawings.
10th floor fitness area
T/I BUILD OUT 'AMENITY SPACE' / 'FITNESS CENTER' / 10TH FLOOR ----- occupancy: B construction type: I-A occupant load, total: 122 sprinklered: YES SAC due: 0 ----- architect: ROY GILMAN GARRISON - 55654 ----- Issuance of this permit shall no
HVAC system for 5th,6th & 7th floors will utilize existing main air handling units in each floor and an existing energy recovery unit at roof supplying outside air to all these main air handling units in each floor. Adding fan-powered boxes, VAV boxes, fi
Tenant Improvement - Floors 5-7 CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 TO SCHEDULE A CERTIFICATE OF OCCUPANCY INSPECTION TWENTY (20) BUSINESS DAYS BEFORE THE DATE OF DESIRED OCCUPAN
BREAK ROOM SINKS AND RESTROOM FIXTURES ON THE 5TH 6TH AND 7TH FLOORS
Installation of 2 factory built fireplaces in Lobby and Lounge
Steam & Chilled Water piping from new vault#19 to building. Refer to attached drawings.
Tenant Improvement of HVAC system for nine floor of a high rise building, will utilize main air handling unit in each floor for ventilation air (OA), adding VAV boxes, fan-powered boxes, fan-coils, transfer fans, finned tube radiation, hydronic piping
PLUMBING FOR 9 FLOORS OF OFFICE BUILDOUT (12TH-21ST)
HVAC system for shell and core design for a mix use 37 story building, will utilize district steam and chilled water system and the steam will be converted to hot water, enclosed parking that have been reviewed under BLDG800303, retail/restaurant and off
HVAC system for skyway adding 4 fan coil units with gravity roof ventilator for outside air connection, hydronic pumps, hydronic piping, finned tube radiation, one unit heater, supply diffusers, return grills and all associated duct work. Refer to attac
construct skyway connections. sck work includes connection from library to 365 Nicollet and library to 250 Nicollet special inspections required.
demo and preparation for construction of skyway connections. excavation and construction of skyway foundations. sck special inspections required engineer: LHB
construct core and shell of 36 story mixed use building. sck all interior buildouts on all floors require separate permits. CERTIFICATE OF OCCUPANCY REQUIRED FOR EACH DWELLING UNIT, HOTEL, OFFICE SPACE, AND EACH RETAIL/RESTAURANT SPACE CONST TYPE: 1
PLUMBING ROUGH IN L1-L37
construct structural concrete components of new highrise office/hotel/condo building. sck****
Parking level equipment exhaust fans and intakes and this partial review of parking level is provided to assist the contractor for sleeve and opening requirements for foundation and floor of parking. Whole building will be reviewed during the building mec
TEMP HEAT
PARKING RAMP FIXTURES ON LEVELS P1 -P3: INCLUDING WASTE AND VENT, RAIN WATER AND DOMESTIC WATER
construction of foundation systems up to and including level 1 building structure. sck*** special inspections required****** engineer: hamvas #56197