$84,998,658
Add 1 breakroom sink on 10th floor, and add 1 breakroom sink on 7th floor
*** Adjust Fees*** Tenant Improvement - Partial Area Finish - Levels 7 & 10 (replacing permit BLDG962125) certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC spri
NON STRUCTURAL INTERIOR DEMO (MAA) ROY GILMAN 55654
Level 7 Tenant Improvement (SW corner) & Lounge Area certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC sprinklered: yes architect: Roy Garrison #55654
1. All exhaust air discharge point will meet the MMC 2020section 501.3 requirements. Trash room exhaust, installing exhaust fan, motorized damper, makeup air duct with fire & smoke damper, GRDs and all associated ductwork. Refer to attached drawings.
break room sink and water heater
(DMH - ProjectDox) REMODEL TO 3,205 SQFT 9TH FLOOR OFFICE, SUITE 920. NO CHANGE IN CORRIDOR OR EXIT. Const type: II (presumed) Occupancy: B 2020 MSBC Occupant Load: 22 (Archit calc.) Sprinkled: YES 20% accessibility upgrades: COMPL
Tenant space finish out, adding two fan-powered boxes with hot water reheat coils, adding two VAV boxes with hot water reheat coils, finned tube radiation, GRDs and all associated ductwork. Refer to attached drawings.
9th floor break room sink
HVAC system, Gateway building floor 8 and part of 9th floor finish out, using existing main building supply system and adding 22 VAV boxes with reheat hot water coil , 22 fan-powered boxes with reheat hot water coil, 2 ton data room AC unit, GRDs and all
buildout 8th floor and partial 9th floor office tenant. certificate of occupancy required: yes (first tenant new building) special inspections required: yes const type: 1a occupancy: b 2020 MSBC sprinklered: yes Tenant:
HVAC alteration, reusing building main supply and return duct through existing air handling unit, installing new 24 hot water reheat VAV boxes, one chilled water fan-coil unit, condensate drain pump, fin tube radiation, GRDs and all associated ductwork.
FOR SUITES 800 & 900 BREAKROOM(S) & WELLNESS ROOM(S): INSTALL PLUMBING FOR (3) BREAKROOM SINKS, (2) WELLNESS ROOM SINKS, (1) LAV, AND (1) TOILET
INSTALL 2 NEW SINKS FOR BREAK AREA AND WELLNESS ROOM. 11TH FLR
HVAC system alteration, installing 13 VAV boxes with hot water reheat coils, 8 fan-powered with hot water reheat coils, one fan-coil unit, fin tube radiation, hydronic piping, GRDs and all associated ductwork. Refer to attached drawings.
sink with drain on the 11th floor
INTERIOR REMODEL AT 11 TH FLOOR (MAA) certificate of occupancy required: NO const type: I A occupancy: B 2020 MSBC occupant load: 452 sprinklered: YES energy code chapter used: MN 2020 elevator review __NO______ 20% access
1 TEMP HEATER
5 TEMP HEATERS
Tenant finish out, adding three fan-powered boxes, four VAV boxes, fin tube radiation, hydronic piping, GRD's and all associated ductwork. Refer to attached drawings.
OFFICE BUILD OUT FOR UNITED PROPERTIES - 9TH FLOOR
Tenant Improvement of HVAC system adding fan powered & VAV boxes, CRAC unit, hydronic piping, transfer fan, exhaust fans, one hydronic pump, finned tube radiation, hydronic piping, GRD's and all associated ductwork. Refer to attached drawings.
10th floor office buildout
THIS PERMIT WAS CREATED TO ADJUST THE VALUATION FOR BLDG908333. NO DRAWINGS WITH THIS PERMIT. TENANT IMPROVEMENT FOR 9TH FLOOR. (JJL)
9TH FLOOR TENANT IMPROVEMENT WORK FOR GATEWAY MANAGEMENT OFFICE ON 9TH FLOOR. SOME STRUCTURAL WORK. CONCRETE BEAM TO BE REINFORCED BY CARBON REINFORCED POLYMER (CRP). CRP TO BE PROTECTED PER UL N850 (JJL) certificate of occupancy required: no