930 MAIN ST NE, Minneapolis
EGRESS WINDOW & WELL FACING 10TH AVE NE Additional Building permit is required to legally convert basement space to bedroom. Basement bulletin provided with approved documents for reference of bedroom conversion requirements.
1 MAIN ST SE, Minneapolis
outdoor at-grade plaza renovation.
1606 MAIN ST NE, Minneapolis
(DMH - ProjectDox) INSTALL NEW PARTITION WALL AT 2ND FLOOR OF SFD IN EXISTING BEDROOM FOR NEW BEDROOM DOOR LOCATION AND NEW 3/4 BATHROOM. INSTALL INSULATION AND VAPOR BARRIER AT EXTERIOR CONDITIONS. INSTALL CEMENT BACKER BOARD FOR CERAMIC TILE SURFA
930 MAIN ST NE, Minneapolis
Remove and replace the air conditioner
420 MAIN ST SE, Minneapolis
New Building at Bluff Park Certificate of Occupancy is required (added 11/30/22) CONST TYPE: 5-B NUMBER OF STORIES: 1 OCCUPANCY: A-5 2020 MSBC OCCUPANT LOAD: 63 SPRINKLERED: NO FIRE ALARM: NO ENERGY CODE CHAPTER USED: 1323 Sea
420 MAIN ST SE, Minneapolis
SAC: _1_CHARGES _0_CREDITS = _1_NET MET COUNCIL LETTER DATED _1/5/22_
1000 MAIN ST NE, Minneapolis
CONSTRUCT 5 STORY APARTMENT BUILDING. 49 units total. 1 type A unit provided all remaining units are type B. certificate of occupancy required: yes CONST TYPE: 5a OVER 1a PODIUM NUMBER OF STORIES: 5 OCCUPANCY: R2 2020 MSBC SPRINKL
1618 MAIN ST NE, Minneapolis
Replace 13 windows within existing openings.
420 MAIN ST SE, Minneapolis
We would like to send in plans for plan review. New park building offering restrooms, thermostatic mixing station, emergency eyewash, water heater, recirc pump and exterior drinking fountain
1000 MAIN ST NE, Minneapolis
NEW 49 UNIT APT BLDG - 5 STORIES
101 MAIN ST NE #11, Minneapolis
REPLACE WINDOWS - UNIT 11 ----- windows with sill heights less than 36 inches above the floor shall be equipped with fall prevention devices that limit the window opening to less than 4 inches in accordance with 2020 MSBC 1015.8. CARBON MONOXIDE
115 MAIN ST SE, Minneapolis
RENOVATE EXISTING WOMEN AND MEN RESTROOMS FOR ACCESSIBILITY CODE COMPLIANCE ON MAIN FLOOR OF SAINT ANTHONY MAIN THEATER. AAJ (PROJECT DOX PLANS). certificate of occupancy required: NO mechanical plans required for certificate of occupancy mechanical p
1511 MAIN ST NE, Minneapolis
METER MOVE Q2 - 2021 BATCH #27
1333 MAIN ST NE, Minneapolis
Remove and replace 16 windows. Like for like, no structural changes
1 MAIN ST SE, Minneapolis
REPLACE EXISTING STATE M#SB68230SFE WATER HEATER WITH A NEW RHEEM ES85-30-G ELECTRIC WATER HEATER
115 MAIN ST SE, Minneapolis
Renovating existing bathroom.
701 MAIN ST SE, Minneapolis
TELECOMMS EQUIPMENT - REPLACE ----- engineer: MARK EDWARD PATTERSON - 53385 engineer: SHAWN HOFFMEYER - 52554 - "Based on our analysis we have determined the... structure and foundation [to have] Sufficient Capacity." ----- Maintain fire-caulking/f
1000 MAIN ST NE, Minneapolis
Wrecking a multifamily (4) dwelling Structure, per structural details.
1525 MAIN ST NE, Minneapolis
CONVERT GARAGE INTO LIVING SPACE (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALARMS REQUIRED IN ACCO
3515 MAIN ST NE, Minneapolis
drain tile
3639 MAIN ST NE, Minneapolis
furnace
1525 MAIN ST NE, Minneapolis
Remodel: kitchen sink and new gas range, upper bath: toilet, lav, lower bath: toilet, shower, lav
701 MAIN ST NE, Minneapolis
INSTALL GAS FIREPLACE AND GAS LINE
729 MAIN ST NE, Minneapolis
gas dryer
1 MAIN ST SE, Minneapolis
1- For vestibules contractor shall provide controls configured to shut off the source of heating when the outdoor air temperature is greater than 60°F . Vestibule heating systems shall be controlled by a thermostat located in the vestibule configured to l