Saint Paul, MN
Saint Paul, MN
32
9
$1,308,743
Remove one booster compressor and one high side compressor. Replace with new booster with economized suction
The permit has been cancelled - A refund was requested on 2/10/2026 (email), as the project has been cancelled by Comcast. Inspector’s Note: A winter moratorium is in effect for excavation on ROW structures. Do not excavate ROW structures (asphalt or concrete) during the winter season moratorium. For this permit, only directional boring is allowed on the boulevard (only soil boring). JB0002352624 - Directional bore 302' from existing vault at NE corner of Chester St and Plato Blvd E to 240 Chester St
FOUNDATION SUPPORT FOR NEW EXTERIOR CONDENSER.
Other-See Comments. REMOVAL AND REPLACEMENT OF BITUMINOUS PARKING LOT PAVEMENT. ROUGHLY 76,000 SQ FT
INSTALL 1/4" HD SECUROCK INSTALL 60 MIL REINFORCED TPO. 10/9/24: MAILED PERMIT, PLACARD & STAMPED DRAWINGS – AC
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.