Minneapolis, MN
Minneapolis, MN
119
6
$35,395
1
Remove and replace the furnace and A/C
Replace ac with a 2.5 ton Lennox
kitchen/living area alteration. sck Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALRAMS REQUIRED IN ACCOR
Kitchen Remodel SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. THIS WORK MUST BE COMPLETED BY A LICENSED CONTRACTOR IN A MULTI-FAMILY DWELLING. WALLS SEPARATING DWELLING UNITS IN THE SAME BUILDIN
Replace kitchen exhaust hood
replace the existing Kitchen sink dishwasher and disposal
(DMH - ProjectDox) SELECT REPAIRS TO EXISTING CANTILEVERED TOWNHOME BALCONY TO SAME. REPLACE CENTER TIMBER BEAM WITH 2X BACKSPAN, AND TIMBER RIM WITH SAME SIZE TIMBER MEMBERS (4"X6" TIMBERS). REPLACE 2X DECK BOARDS WITH NEW. EXISTING GUARD TO REMAI
REPLACING CENTER DECK BEAM.. BEAM IS CANTILEVERED OUT BEYOND HOUSE. APPLICANT HAS ORIGINAL ARCHITECT DRAWING. MATCH BEAM WITH SAME SIZE 6X10. MUST BE TREATED. ADD BLOCKING BETWEEN BEAM AND FLOOR. ADD HURICANE TIE ON FONT OF BEAM AND BACKSIDE. WILL R
Replace 40 gallon natural gas atmospheric vent water heater
BATHROOM REMODEL. SAME LAYOUT. TILE AND FINISH UPDATES. NEW SHOWER TILE. NEW VANITY. TUB TO REMAIN. (JJL)**************** SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK.************ CARBON
FOR MASTER BATHROOM - INSTALL SHOWER DRAIN IN SAME LOCATION. REPLACE BATHTUB FAUCET SET, RESET TOILET, RE-WORK DOUBLE LAVATORY'S WATER LINES TO COME OUT OF WALL AND INSTALL ALL NEW FIXTURES.
Kitchen venting- make up air
install gas fireplace
KITCHEN AND BATH REMODEL;MAIN FLOOR, MUDROOM SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. CARBON MONOXIDE ALARMS REQUIRED IN ACCORDANCE WITH MN. STAT. 299F.50 IRC 313.2.1. When interior altera
a/c and furnace
replace water heater
DEMO AND REBUILD EXTERIOR DECK OFF DINING ROOM AT TOWNHOUSE, EXISTING PATIO DOOR AND EXISTING SPIRAL STAIRWAY TO REMAIN. INSTALL 2x10 TREATED JOISTS AND RIM, (2) 2x10 TREATED BEAMS, 2x6 CEDAR DECKING, 36" MIN. HT GUARDS. (LAH) Building Code: 2015 MNSBC
DEMO AND REBUILD EXTERIOR DECK OFF MAIN FLOOR AT TOWNHOUSE, EXISTING PATIO DOOR TO REMAIN. INSTALL 2x10 TREATED JOISTS AND RIM, (2) 2x10 RIM, 6x6 POSTS, 5/4" TREX ENHANCE COMPOSITE DECKING. REUSE EXISTING FOUNDATION IF POSSIBLE. AN INSPECTION IS REQUIRE
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.