Saint Cloud, MN
Saint Cloud, MN
38
2
This is for a Main Bathroom Remodel, changing existing outlet to a quad outlet. Fixing up vanity light wiring, adding a switch for shower light and adding a bath fan along with possibly 1 other light over the toilet.
Main Floor Bathroom Remodel, Ripping down to studs with new Sheetrock and plumbing. Deleting the existing shower and making the tub into a tub/shower combo.
Plumbing Bathroom Remodel
Basement Bath - Fiberglass Shower Removal to install Walk in Shower - Tear out to studs - Tear out Closet - Move Drain & Plumbing to the Left Wall - Build New Back Wall for 60" Opening - Fur out SD Wall & Wrap all exposed sides of wall with Surround Materials---Move Shower Light Switch- -Electrical Subcontractor Information To Be Provided When Scheduled.
Basement Bath - Fiberglass Shower Removal to install Walk in Shower - Tear out to studs - Tear out Closet - Move Drain & Plumbing to the Left Wall - Build New Back Wall for 60" Opening - Fur out SD Wall & Wrap all exposed sides of wall with Surround Materials---Move Shower Light Switch--Electrical Subcontractor Information To Be Provided When Scheduled.
RECONNECT OUTSIDE LIGHTS AND OUTSIDE OUTLETS
TEAR-OFF/RESIDE
replace water line service LSL
Air conditioner reconnect
Install A new meter and mast due to storm damage.
Kitchen remodel. Add receptacles, light and switch.
Excavation- spot repair of lateral sewer line.
Upgrade panel and add 2 circuits to kitchen
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.