Saint Paul, MN
Saint Paul, MN
6
3
$3,900
HPC - REROOF DUE TO HAIL DAMAGE NOTE: STORMWATER RUNOFF SHALL NOT DRAIN TOWARDS NEIGHBORING PROPERTIES. **ReRoof with Tear-Off- No Structural Changes. Flashing of the junctions of the roof to vertical surfaces (chimneys, dormers, walls, etc.) IS required. New flashing must be used if the original flashing is damaged, deteriorated or missing. If one does not already exist; it is highly recommended that chimneys which penetrate a lower portion of a roof have a "cricket"-type structure built between the chimney and the upper portion of the roof to improve the effectiveness of flashing and counterflashing around the chimney for long-term weather-proofing. A "starter" for ice-damming and water-backup is required from the eaves to a point one (1) foot in from the exterior wall (2 feet if the roof slope is less than 4:12). The Building Code minimum, for a slope of 4:12 or more, is 1 layer of Type 15 felt and 1 layer of No. 40 coated roofing or coated glass base. Any of the self-seali
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.