Saint Cloud, MN
Saint Cloud, MN
65
1
Upgrade boiler to combi unit with 199,000 BTUS
Upgrade boiler to combi unit with 199,000 BTU
Upgrade boiler to combi unit with 199,000 BTU
Furnace and AC reconnect.
Furnace and AC replacement.
ADDED THREE CIRCUITS IN BASEMENT (2) 20A AND (1)15A SEE NICK KAUTH AT 320.282.9633
Replacement of 5 windows County funded project for special needs client, removing current windows and replacing with new tempered/protectant film glass Lower level bedroom west (2) Upper level bedroom west (1) Upper level kitchen south (1) Upper level living room east (1)
Park addition project- connection of city water services and reinstall meter
replace water service line LSL
Repair exterior wall near the building entrance on the east side of the building after car damage. We will be doing framing repairs, which is the right side of the front main entrance closest to the parking lot. We need to remove an area of vinyl siding, drywall and carpet on the stairs to gain access to the Framing we will reattach the siding and the carpet and the drywall will be replaced.
Pull and reset one patio door and one window.
Add stairs to back deck. 36" wide x 12' run.
Membrane Change Out - Removal of existing ballast and EPDM. Installation of loose lay 1.5" over the existing insulation and install 60 mil EPDM. New ballast will be installed over membrane.
Replacing 3 skylights
CHECK PANEL, REPLACE BREAKERS CHECK CIRCUIT FOR WATER HEATER CONTACT IS NICK KAUTH 320.282.9633
CONNECTION OF NEW SIGNS
Relocating Duct Work, Adding New Duct Work, Installing 2 Exhaust Fans
Customer is getting a replacement gas water heater.
Customer is getting a replacement gas water heater.
Plumbing Build Out, add bathroom and breakroom
Selective demolition of interior walls & finishes to accommodate new construction. New tenant floor plan consists of: 2 vestibules, lobby, scheduler, workroom, conference area, office, staff restroom, breakroom, guidance/mother's room, BCBA, 3 1-on-1 rooms, 5 treatment rooms, gross motor room, janitor room & existing men's and women's restrooms. Install new chain link fence area on south end of building/tenant space.
Wire autism health facility, 20 circuits using existing feeder
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.