Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
225 3RD AVE S, Minneapolis
Refer to Plans. Since Rtu #1 & 2 are seating in top of the restroom, the exhaust and vent system should be minimum 10 feet away from rooftop units outside air intake. In this project they are not using return air duct and we have to make sure the all sp
225 3RD AVE S, Minneapolis
PHASE II - VIDODENS 285MBH BOILER, INFLOOR HEAT & RELATED EQUIPMENT PER ENGINEERED DRAWING
225 3RD AVE S, Minneapolis
REPAIR/REPLACE EXISTING UNDERGROUND STORM PIPING
3225 23RD AVE S, Minneapolis
REPLACE RANGE
225 3RD AVE S, Minneapolis
construct one story banquet center expansion. sck#1 certificate of occupancy required yes special inspections required yes const type: 2b occupancy: 2015 MSBC occupant load: 2684 sprinklered: yes 20% accessibility upgrade
3225 23RD AVE S, Minneapolis
replace water heater
4225 3RD AVE S, Minneapolis
SECOND WATER HEATER AT CHILD DEVELOPMENT AND CARE SITE - 40 GALLON/40000 BTU
225 3RD AVE S, Minneapolis
Super Bowl - Temp Heat - The Depot Two (2 ) heat sources - LP - 170,000 BTU Heaters
225 3RD AVE S, Minneapolis
FOR LOBBY - INSTALL GAS FIREPLACE AND GAS LINE
225 3RD AVE S, Minneapolis
WALK-IN COOLER
225 3RD AVE S, Minneapolis
MAIN FLOOR 18 FIXTURES
225 3RD AVE S, Minneapolis
HVAC Depot Kitchen, DX/electric fan coil, MAU, dishwasher exhaust
225 3RD AVE S, Minneapolis
FINISHING OF BANQUET STAGING ROOM. SCK#1
225 3RD AVE S, Minneapolis
boiler work including gas and water piping.
225 3RD AVE S, Minneapolis
REMODEL MAIN LEVEL RESTROOMS IN DEPOT BANQUET CENTER, ADDING ACCESSIBLE AND AMBULATORY STALLS TO MENS AND WOMENS RESTROOMS. (LAH) certificate of occupancy required NO mechanical plans required for certificate of occupancy mechanical plans/letter of
4225 3RD AVE S, Minneapolis
WATER HEATER
225 3RD AVE S, Minneapolis
Install two new rooftop units. Gas/Electric, new supply air ductwork
225 3RD AVE S, Minneapolis
Replace two existing 2 ton a/c units and air handlers. Same size as existing.
225 3RD AVE S, Minneapolis
REMOVE MECHANICAL EQUIPMENT AND CONSTRUCT SHAFT FOR FUTURE ELEVATOR IN EXISTING STORAGE AREAS AT BANQUET CENTER (JAG) PHASE 1 PLANS. NO CHANGES IN EXISTING USES. certificate of occupancy required: no mechanical plans required for certificate of occupan
225 3RD AVE S, Minneapolis
SAC FEES ONLY - MCES LETTER 12/02/16 (161202B7)
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.