Rochester, MN
Rochester, MN
222 SW 3 AVE, Rochester
Mayo - Guggenheim Building Electrical work for conference rooms refresh Mayo WO ROXX23E0140 Adair job 16953 This work is T&M
222 SW 3 AVE, Rochester
ROXX23E0140/Kelly Merrick Conference rooms across the enterprise need critical updates to support hybrid meetings and provide an equitable experience for remote meeting attendees.
222 SW 3 AVE, Rochester
Mayo Guggenheim Building-Subway Level-Project ROXX23C0050 Pipe chilled water to new fancoil
222 SW 3 AVE, Rochester
ROGU23C0050 Temp Controls
222 SW 3 AVE, Rochester
Mayo - Guggenheim Building - 15-18 Electrical work to remodel Lab 15-18 Mayo WO 0032206 Adair WO W4176 This work is T&M
222 SW 3 AVE, Rochester
Mayo - Guggenheim Building - 6-02 Electrical work to install new lab workstations Mayo WO 0021291 Adair WO W3064 This work is T&M
222 SW 3 AVE, Rochester
Set new disconnect and feed from existing panels to support new vacuum pumps. Foster job number R4837
222 SW 3 AVE, Rochester
Connect exhaust hoods, new lighting and add wiremold to lab benches. our job number 223057
2222 NW 11 AVE, Rochester
Fireplace
222 SW 3 AVE, Rochester
-Gugg 5 Lab -Plumbing for Fume Hoods
4222 NW 13 AVE, Rochester
Installing three geo lock anchors | Other
222 SW 3 AVE, Rochester
Install twist and fill chemical feeder
222 SW 3 AVE, Rochester
Install New Drinking Fountain
222 SW 6 AVE, Rochester
Wiring for replacement chiller equipment Add panel for outdoor condenser fans
1222 SE 8 AVE, Rochester
Add 3 supply vents to basement. Add 2 return air vents to basement.
222 SW 3 AVE, Rochester
Remove existing Torritt dust collector, and associated ductwork. Remove existing Fan Coil Unit , furnish and install new Daikin BCHD040 Fan Coil Unit, chilled water cooling only unit.
1222 SE 8 AVE, Rochester
Basement finish to include completing the drywalling and main level bedroom window replacement [rental] | Basement Finish
222 SW 3 AVE, Rochester
Install 2 new RP's.
1222 SE 8 AVE, Rochester
Added basement outlets to get proper spacing.
222 SW 3 AVE, Rochester
Mayo - Guggenheim Building - 4-42 Electrical work for addition workstation Mayo WO 002953 Adair WO W1739 This work is T&M
222 SW 3 AVE, Rochester
Mayo - Guggenheim Building - 9-23 Electrical work to remodel Lab 9-23 Mayo WO 0006863 Adair WO W2458 This work is T&M
222 SW 6 AVE, Rochester
Replace chiller.
222 SW 3 AVE, Rochester
-Hilton 4 -Lab remodel
222 SW 3 AVE, Rochester
ROXX21C0130 Scott Knapp - 2021 annual elevator modernization, upgrade / modernization to Guggenheim elevators 7 and 8
2222 NE 5 AVE, Rochester
ac
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.