Rochester, MN
Rochester, MN
221 SW 1 AVE, Rochester
Downtown Subway refresh zone #3. (Hilton Building / ROSI 19C0013)
221 SW 4 AVE, Rochester
MAYO: BALDWIN: SL: 100: OFFICE CLERICAL REPLACE ROOF DRAINS WO 364281 3919-617
221 SW 1 AVE, Rochester
MAYO: MN BIO BUSINESS: 07: 00: ELEVATOR LOBBY REPLACE DRINKING FOUNTAIN WO 364341 3919-623
1221 SE 9 AVE, Rochester
Electrical (complete rewiring of lower level) - Completing renovation down to studs of lower duplex unit (main level); this work is separate from R19-1383RB
1221 SE 9 AVE, Rochester
Electrical (complete rewiring of 2nd level apartment) - Duplex, alterations to second story unit remove/replace drywall, plumbing, electrical adding steel door to bottom of interior stair. Maintain rating between units.
221 SW 1 AVE, Rochester
MAYO - MINNESOTA BIOBUSINESS CENTER: 04-00: ELEVATOR LOBBY - 8R180650 WORK SPACE REMODEL - WO 360665 R8302 THIS WORK IS T&M
1221 SE 9 AVE, Rochester
Completing renovation down to studs of lower duplex unit (main level); this work is separate from R19-1383RB | Other
221 SW 4 AVE, Rochester
MECHANICAL - Baldwin building - add cooling to the subway. Mayo number # ROSI19C0011. Harris Job number is 56456-70
1221 SE 6 AVE, Rochester
ELECTRICAL - WIRING REPLACEMENT FURNACE AND AC
221 NW 6 AVE, Rochester
MECHANICAL - REPLACEMENT FURNACE AND AC
221 SW 1 AVE, Rochester
ELECTRICAL - Move and add new lighting and add outlets and floor boxes. Job #219043
221 SW 4 AVE, Rochester
ELECTRICAL - New lighting and lighting controls in Mayo Subway System Zone 1, Project #ROSI19C0011. (Update décor in the subway.) (Baldwin Building / ROSI 19C0011)
221 SW 1 AVE, Rochester
HYDRONIC - work associated with Global Business Solutions remodel of existing space on the 6th and 7th floor. (Bio Business Center / ROBB18C0010) Job # 56468-01 St. Marys Campus
221 SW 1 AVE, Rochester
MECHANICAL - HVAC Work associated with Global Business Solutions remodel of existing space on the 6th and 7th floor. (BioBusiness Center / ROBB18C0010) HARRIS JOB # 56464-5080
221 SW 1 AVE, Rochester
Global Business Solutions remodel of existing space on the 6th and 7th floor. (BioBusiness Center / ROBB18C0010)
221 SW 1 AVE, Rochester
Mayo subway refresh Wanek Family concourse. (Mayo Subway/ ROSI19C0012)
221 SW 4 AVE, Rochester
Update décor in the subway. (Baldwin Building / ROSI 19C0011)
1221 SE 9 AVE, Rochester
Duplex, alterations to second story unit remove/replace drywall, plumbing, electrical adding steel door to bottom of interior stair. Maintain rating between units. | Other
221 SW 4 AVE, Rochester
ELECTRICAL - FITUP OF STORAGE SPACE FOR PRINTING EQUIPMENT. EGAN JOB# 608896-910 MAYO # 7R180690 (New metal 3D printer) (Baldwin Building / 7R180690)
2216 NW 18 1/2 AVE, Rochester
PLUMBING - installation of water heater
221 SW 4 AVE, Rochester
PLUMBING - CHANGE AIR PIPING, CONDENSATE PIPING, AND FIXTURES. (New metal 3D printer.) (Baldwin Building / 7R180690)
221 SW 4 AVE, Rochester
HYDRONIC - PIPING TO 4 VAV'S AND 3 FCU. (New metal 3D printer.) (Baldwin Building / 7R180690)
221 SW 4 AVE, Rochester
Electrical (Temperature Controls) for New metal 3D printer. (Baldwin Building / 7R180690)
221 SW 1 AVE, Rochester
Electrical ( Temperature Controls) for Global Business Solutions remodel of existing space on the 6th and 7th floor. (BioBusiness Center / ROBB18C0010)
221 SW 1 AVE, Rochester
Plumbing work associated with St. Mary's Campus - Global Business Solutions - Bio Business Building 6th & 7th Floors. ROBB18C0010
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.