Minneapolis, MN
Minneapolis, MN
10
8
$134,137
SOLAR ON GARAGE. (JJL) ROOF EVALUATION BY: XIAOJIAN XIE, PE - #62299 INSTALL A SOLAR PV SYSTEM ON ROOF OF BUILDING. COLLECTOR CAPACITY _7.92___ KW SOLAR CHECKLIST ATTACHED. MEETS OR EXCEEDS SRCC CERT PER MN RULES 1325.1
THIRD FLOOR BATHROOM REMODEL (MAA) Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CONDITIONING/VENTILATION WORK. SMOKE ALARMS REQUIRED IN
replace cast iron radiator with cast iron baseboard
Third floor bathroom - New drain for tile shower faucet. Install new toilet and lav faucet.
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.