2115 SUMMIT AVE, Saint Paul
THIS PERMIT APPLICATION IS FOR FOR A NEW 5 STORY, 481 BED RESIDENCE HALL W/ DINING FACILITY AND BELOW GRADE PARKING.
2115 SUMMIT AVE BLDG YR 2 H, Saint Paul
POST-TENSIONED SLAB FOR THE 260 BED STUDENT HOUSING PROJECT
2115 SUMMIT AVE BLDG YR 2 H, Saint Paul
FOOTINGS AND FOUNDATION AND STRUCTURAL FOR THE 260 BED STUDENT HOUSING PROJECT
2115 SUMMIT AVE BLDG UST, Saint Paul
IRELAND HALL - REMODEL OF IRELAND HALL INVOLVING NEW FINISHES, NEW BATHROOM LAYOUT, ELEVATION CONSTRUCTION, NEW REC SPACE
2115 SUMMIT AVE, Saint Paul
FOUNDATION ONLY FOR A NEW 5 STORY, 481 1st year BED RESIDENCE HALL W/ DINING FACILITY AND BELOW GRADE PARKING. THIS APPLICATIONS IS FOR EVERYTHING BELOW THE LEVEL 1 SLAB.
2115 SUMMIT AVE, Saint Paul
RENOVATE EXISTING LOWER LEVEL RESTROOMS AND ADD ELEVATOR
2115 SUMMIT AVE BLDG YR 2 H, Saint Paul
UTILITY TUNNEL - CONSTRUCT A CONCRETE UNDERGROUND UTILITY TUNNEL FROM EXISTING HENRICK TO NEW 2ND YEAR RESIDENCE HALL
2115 SUMMIT AVE BLDG UST, Saint Paul
HPC - STAGE FOR COMMENCMENT (MAY 25 & 26) - O'SHAUGHNESSY STADIUM - OPEN AIR "ROOF" FOR COMMENCEMENT, TOPS ONLY, NO ENDS OR WALLS. HPC - FOOTBALL FIELD - TENT STRUCTURE OVER STAGE FOR COMMENCEMENT @ UNIVERSITY OF ST THOMAS
2115 SUMMIT AVE BLDG UST, Saint Paul
FOOTING, FOUNDATION, CORE & SHELL - IVERSEN CENTER FOR FAITH (CHAPEL OF ST THOMAS AQUINAS) - OFFICE AND ASSEMBLY ADDITION TO AN EXISTING ADDITION TO CHAPEL BUILDING, INCLUDING OUTDOOR PLAZA
2115 SUMMIT AVE BLDG UST, Saint Paul
BUILDING A STAGE AND ROOF FOR THE MN SPECIAL OLYMPICS EVENT ON 06/20/2019 AND TEAR DOWN THE STAGE SAME NIGHT OR POSSIBLY MONDAY, 6/24/2019. SEE ATTACHED DOCUMENTS FOR STAGE/ROOF INFO.
2115 SUMMIT AVE BLDG UST, Saint Paul
SITEWORK - IVERSEN CENTER FOR FAITH (CHAPEL OF ST THOMAS AQUINAS) - OFFICE AND ASSEMBLY ADDITION TO AN EXISTING ADDITION TO CHAPEL BUILDING, INCLUDING OUTDOOR PLAZA
2115 SUMMIT AVE BLDG UST, Saint Paul
N/A. HPC - JR ROACH CENTER - RE-ROOFING
2115 SUMMIT AVE BLDG UST, Saint Paul
RENOVATE SPACE
2115 SUMMIT AVE BLDG UST, Saint Paul
TEMPORAY STAGE & ROOF FOR PERFORMANCE
2115 SUMMIT AVE BLDG UST, Saint Paul
HPC - FOOTBALL FIELD - TENT STRUCTURE OVER STAGE FOR COMMENCEMENT @ UNIVERSITY OF ST THOMAS
2115 SUMMIT AVE BLDG UST, Saint Paul
REPLACEMENT OF TURF ON BASEBALL AND FOOTBALL FIELDS. SITE GRADING, PAVING, SITE WALLS, AND ATHLETIC EQUIPMENT.
2115 SUMMIT AVE BLDG UST, Saint Paul
REPLACEMENT OF TURF ON BASEBALL AND FOOTBALL FIELDS. SITE GRADING, PAVING, SITE WALLS, AND ATHLETIC EQUIPMENT. DEMOLITION AND SITE WORK ONLY
2115 SUMMIT AVE BLDG UST, Saint Paul
PARTIAL REMODEL OF THE LOWER LEVEL
2115 SUMMIT AVE BLDG UST, Saint Paul
UNIVERSITY OF ST THOMAS - AQUINAS HALL - RESTROOM REMODEL PROJECT FOR THE LOWER 1ST, 2ND & 3RD LEVEL MENS AND WOMENS BATHROOMS.
2115 SUMMIT AVE BLDG UST, Saint Paul
CONSTRUCT NEW PARTITION WALL BETWEEN KITCHEN AND CONVENIENCE STORE.
2115 SUMMIT AVE BLDG UST, Saint Paul
2115 SUMMIT AVE, Saint Paul
2115 SUMMIT AVE BLDG UST, Saint Paul
2115 SUMMIT AVE, Saint Paul
Grading.