Minneapolis, MN
Minneapolis, MN
Minneapolis, MN
210 GRANT ST W #305, Minneapolis
INSTALL 1.5 TON/16 SEER AIR CONDITIONING
210 GRANT ST W #125, Minneapolis
1.5 TON/16 SEER AIR CONDITIONING - Unit #125
210 GRANT ST W #501, Minneapolis
KITCHEN REMODEL IN CONDO UNIT #501. DEMO WING WALL TO EXPAND KITCHEN CABINETRY INTO DINING. (DM#2) REPLACE 2 VANITIES IN BATHROOM AND MASTER BEDROOM. REPLACE ENGINEERED FLOORING WITH NEW AND NEW ACOUSTICAL MATTING. APPLICANT TO PROVIDE PRODUCT M
210 GRANT ST W #419, Minneapolis
REPLACE FAN COILS DX & HOT WATER ALONG WITH CONDENSING UNIT ON ROOF
210 GRANT ST W #416, Minneapolis
REPLACE FAN COIL UNIT WITH DX & HOT WATER COILS ALONG WITH CONDENSING COILON ROOF
210 GRANT ST W #114, Minneapolis
REPLACE FAN COIL UNIT WITH DX & HOT WATER COILS ALONG WITH CONDENSING COILON ROOF
210 GRANT ST W #227, Minneapolis
HOT WATER COIL FURNACE AND 1.5 TON AC
210 GRANT ST W #225, Minneapolis
HOT WATER COIL FURNACE AND 1.5 TON AC
210 GRANT ST W #418, Minneapolis
replace existing furnace, hot water coil, 1.5 ton A/C
210 GRANT ST W #422, Minneapolis
INSTALLATION OF "PERGO XP"LAMINATE FLOORING IN CONDO UNIT #422 WITH INTEGRAL ACOUSTICAL SOUND RATING. (DMH#2) APPLICANT TO CONTACT BUILDING INSPECTOR WHEN ACOUSTICAL MATTING PRODUCT IS INSTALLED, AND BEFORE NEW FLOORING IS PLACED. APPLICANT TO PROVID
210 GRANT ST W #127, Minneapolis
REPLACE 1.5 TON SPLIT A/C AND HW COIL UNIT #127
210 GRANT ST W #327, Minneapolis
Replace existing furnace, HW coil and 1.5 ton split A/C
210 GRANT ST W, Minneapolis
REROOF EXISTING FLAT EPDM ROOF OF CONDOMINUM BUILDING. AAJ#2. - TEAR OFF TO CONCRETE DECK AND INSTALL 1.5" ISO WITH 1/8TH INCH TAPERED SYSTEM. - INSULATE USING AVERAGE VALUE OF R-36 AND INSTALL EPDM SYSTEM WITH BALLAST. ***NOTE: SEE ATTACHED
210 GRANT ST W #220, Minneapolis
new kitchen sink
210 GRANT ST W #616, Minneapolis
WOOD FLOORING AT CONDO UNIT #616 UNDERLAYMENT: SCUBA FROM ALL TILE INC. STC 70 IIC 72. CARBON MONOXIDE ALARMS REQUIRED IN ACCORDANCE WITH MN. STAT. 299F.50 907.2.10 Smoke detection shall be installed: A. on each level of the unit B. in each bedro
210 GRANT ST W #423, Minneapolis
New counter top/ kitchen sink
210 GRANT ST W #312, Minneapolis
REPLACE DISHWASHER - CONDO #312
210 GRANT ST W #220, Minneapolis
REMODEL KITCHEN IN CONDO UNIT #220. (DMH#2) DEMO KITCHEN PARITION WALL TO OPEN FLOOR PLAN TO ADJACENT SPACE. REPLACE CABINETS AND COUNTERS. APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. SMOKE DETECTORS AND CARBON
210 GRANT ST W #626, Minneapolis
REPLACE (1) DISHWASHER - UNIT #626
210 GRANT ST W #305, Minneapolis
REPLACE (1) DISHWASHER UNT #305
210 GRANT ST W #310, Minneapolis
INSTALL WOOD FLOORING AT UNIT 611 (MAA #02) QUITE WALK PAD WITH 57 IIC AND 66 STC
210 GRANT ST W #301, Minneapolis
REPLACE CERAMIC TILE IN KITCHEN AND HALL; NEW CARPET IN DINING ROOM W/CORTEC VINYL/CORK FLOORING (maa) CORETEC PLUS CORK TILES WITH 62IIC AND 63 STC
210 GRANT ST W #521, Minneapolis
CONDO #521 - INSTALL (2) VANITY SINKS
210 GRANT ST W #513, Minneapolis
duct work
210 GRANT ST W #513, Minneapolis
REMOVE SEVERAL PARTITION WALLS IN CONDO. ADD NEW DUCTWORK. UNIT 513
Data sourced from Minnesota Department of Labor & Industry, Minnesota Attorney General, federal OSHA, and municipal permit offices. Records are public and may not reflect pending appeals or corrections.